![Sealite SL-BR DC Installation & Service Manual Download Page 9](http://html.mh-extra.com/html/sealite/sl-br-dc/sl-br-dc_installation-and-service-manual_1227815009.webp)
SL-BR-DC
Up to 4NM Bridge Light - DC Model
Latest products and information available at
www.sealite.com
9
Charging the Battery
New lanterns powered by solar should be left in the sun for 1-2 days to ensure battery is
charged before placing in service.
Preferred Installation Location
For best lantern performance, ensure any solar modules are not covered and are in
clear view of the sky with no shadows.
Lantern Operation
1. Lantern is activated by connecting the battery terminals:
V
BATT+
to +12VDC
V
BATT-
to -12VDC
2. The unit is now ready for normal operation, once placed in darkness.
3. To test, place dark cover (towel or jacket) on top of light to activate sensor, light will come on within
one minute.
4. Ensure that the lantern is secured to the mounting unit.