Care and Maintenance
5-14
•
Seacocks should be closed whenever afloat or re-floating the boat, unless there is risk of
flooding
SCHEDULED MAINTENANCE
Routine inspection and maintenance is an essential activity to prolong the life of the Sealegs
Amphibious Boat, outboard motor, and accessories, as well as being important for crew safety.
The service schedule is determined by the frequency of use, application, and the environment in
which the boat operates.
The Sealegs service schedule consists of a 1
st
Service, an Annual Service, and an Internal Hose
Replacement.. A service placard is placed inside the door of the console, and is used to track the
next scheduled service.
Boat used in commercial or other high usage applications will require more
frequent inspections and maintenance. Adjust the schedule for operating and
environmental conditions.
It is highly recommended that only Authorised Sealegs Resellers undertake boat
maintenance. Please consult the warranty document for more details.
See Sealegs
Warranty on page 8-1.
Please consult the separate outboard owner’s manual for maintenance
information on the outboard engine fitted to the boat.
Summary of Contents for 7.5M HYDRASOL RIB
Page 1: ...OWNER S MANUAL 7 5m...
Page 2: ......
Page 9: ...Before Operating the Boat 2 4...
Page 10: ...Before Operating the Boat 2 5...
Page 72: ...CE Declaration 7 5m 9 1 9 CE DECLARATION 7 5M RIB...
Page 73: ...CE Declaration 7 5m 9 2...
Page 74: ...CE Declaration 7 5m 9 1...
Page 76: ...LESS HASSLE MORE FUN...