23
www.seagullmodels.com
M3x25mm.
7.
3.
4.
M2 clevis.
M2 lock nut.
5) Install the linkage into the connector on the
end of the retract unit as shown. Mounting the
landing gear to the rail with four M3x 25mm.
6) Install a wheel and two wheel collars on
the main landing gear. Secure the collars.
M3x25mm.
8.
3.
Cut.
C/A glue.
7) Install the wheel wells after adjusting the
retracts. Roughen the bottom side of the well
and glue the wells using C/A glue as shown.
8) Install the gear door to the retract strut.
Apply a thin epoxy to the two gear door brack-
ets to secure the gear door to the retract strut
as shown.
6.
2.
Epoxy.