T-34 MENTOR
Instruction Manual.
26
6) Using a modeling knife, carefully re-
move the covering that overlaps the sta-
bilizer mounting platform sides in the
fuselage. Remove the covering from both
the top and the bottom of the platform
sides.
Epoxy
.
7) When you are sure that everything is
aligned correctly, mix up a generous
amount of 30 Minute Epoxy. Apply a thin
layer to the top and bottom of the stabi-
lizer mounting area and to the stabilizer
mounting platform sides in the fuselage.
Slide the stabilizer in place and realign.
Double check all of your measurements
once more before the epoxy cures. Hold
the stabilizer in place with T-pins or mask-
ing tape and remove any excess epoxy us-
ing a paper towel and rubbing alcohol.
Epoxy
INSTALLING VERTICAL STABILIZER
Epoxy
Fill Epoxy
3) Slide the vertical stabilizer back in-
place. Using a triangle, check to ensure
that the vertical stabilizer is aligned 90º
to the horizontal stabilizer.