31
www.seagullmodels.com
4) Elevator and rudder pushrods assembly
as pictures below.
3) Thread one clevis and M2 lock nut on
to each elevator control rod. Thread the horns
on until they are flush with the ends of the con-
trol rods.
495mm.
Cut.
Control horn.
M2 lock nut.
Metal clevis.
Elevator pushrod.
8mm.
8mm.
RUDDER PUSHROD HORN
INSTALLATION.
8mm.
M2 lock nut .
M2 clevis.
Pen.
8mm.
Wire keeper.