13
www.seagullmodels.com
INSTALLING THE MAIN LANDING GEAR
TO FUSELAGE.
8) The blind nuts for securing the landing
gear are already mounted inside the fuselage.
9) Using the hardware provided, mount
the main landing gear to the fuselage.
10) Place the fuselage inverted on the
workbench in a suitable stand. Set the landing
gear in place and use a screwdrive to secure
the landing gear to the fuselage using bolts
M4x20mm and washers. Make sure to use the
threadlock on the bolts so they don’t vibrate
loose.
Cut.
Cut.
Cut.