12
Arising Star.
Instruction Manual.
Control Horn.
Mounting Screws.
Mounting Plate.
5) When you are sure that everything is
aligned correctly, mix up a generous amount of
30 Minute Epoxy. Apply a thin layer to the mount-
ing slot in the top of the fuselage and to the sides
and bottom of the vertical stabilizer mounting
area. Apply epoxy to the bottom and top edges
90º
Vertical
Stabilizer.
Horizontal
Stabilizer.
1) Locate the two nylon control horns, two
nylon control horn backplates and four M2 x
12mm machine screws.
2) Position the elevator horn on the bottom
side of elevator. The clevis attachment holes
should be positioned over the hinge line.
CONTROL HORN INSTALLATION.
3) Remove the stabilizer. Using a mod-
eling knife, remove the covering from below
the lines you drew. Also remove the covering
from the bottom edge of the stabilizer and the
bottom and top edges of the filler block. Leave
the covering in place on the sides of the filler
block.
4) Slide the vertical stabilizer back in
place. Using a triangle, check to ensure that
the vertical stabilizer is aligned 90º to the hori-
zontal stabilizer.
When cutting through the covering to re-
move it, cut with only enough pressure
to only cut through the covering itself. Cutting
into the balsa structure may weaken it.
of the filler block and to the lower hinge also.
Set the stabilizer in place and realign. Double
check all of your measurements once more be-
fore the epoxy cures. Hold the stabilizer in place
with T-pins or masking tape and remove any
excess epoxy using a paper towel and rubbing
alcohol. Allow the epoxy to fully cure before
proceeding.
2) While holding the vertical stabilizer
firmly in place, use a pen and draw a line on
each side of the vertical stabilizer where it
meets the top of the fuselage.
Remove covering.
(2)2MM x 20 MM.