background image

9

Fig. 17

Fig. 18

Fig. 19

5.1. 

Arrange a little square of concrete with a perfect levelling on which the motor reducer will be fixed with the 

special plugs 

(sizes on Fig. 19)

5.2. 

Make sure that in the center of the concrete pad has been forseen an exit for a sufficient number of pipes 

(for all accessories like loop detectors, maglock, photobeam and others)

5.3.

 Before piercing the concrete square for the fixation of the motor reducer, make sure that the distance 

between the centre of the oblong and the gate is of 

 3” 

(Fig. 19)

5.4.

 All openings of a horizontal slide gate are guarded or screened from the bottom of the gate to a minimum 

of 

4 feet (1,22 m)

 above the ground to prevent a 

2-1/2 inch (57,2 mm)

 diameter sphere from passing through 

the openings anywhere in the gate, and in that portion of the adjacent fence that the gate covers in open 
position

5.5.

 Follow the local building code to determine the required depth of the concrete pad.

5.6.

 SEA recommend the following pad measurements:

5. CONCRETE PADS

6. GATE OPERATOR ATTACHMENT

6.1. 

Before starting the installation of the gate operator, make sure that the gate, the support wheels and the 

guides  are  in  optimal  conditions,  there  is  no  impediments  on  the  path  of  the  gate  and  sufficient  space 
between the gate and the adjacent walls.

6.2. 

The operator and the gate MUST be level and parallel.

6.3. 

Attach the operator on the prepared pad using Red Head 

½” x 3 ½”

 Anchors (Fig. 18)

Red Head

Fastener

½” x 3 ½” 

Fig. 20

Fig. 21

MECHANICAL INSTALLATION

3”

16”

27”

Concrete

In Fig. 20 and Fig. 21 it is possible to see the correct installation with open and closed gate respectively; 

notice the obliged run of the chain inside the pinion group which must not be modified.

Open position

Closed position

7. CHAIN INSTALLATION

Summary of Contents for ORION BOX 24V

Page 1: ...ORION BOX 24V REV 03 09 2020 SEA USA Inc 10850 N W 21st unit 160 DORAL MIAMI Florida FL 33172 Phone 1 305 594 1151 Toll Free 800 689 4716 www sea usa com 67411520...

Page 2: ...ildren to play or stay within the path of the moving gate 9 Keep remote control or any other control devices out of the reach of children in order to avoid possible involuntary activation of the gate...

Page 3: ...tor Instructions regarding intended installation of the gate operator shall be supplied as part of the installation instructions or as a separate document The following instructions or the equivalent...

Page 4: ...ll provide warning notices on not assessable further risks SEA USA Inc in its relentless aim to improve the products is allowed to make whatsoever adjustment without giving notice This doesn t oblige...

Page 5: ...objact closer than 16 inches 406mm are not required to be provided with a means of entrapment protection B1 and B2 means of entrapment protection MUST be MONITORED HORIZONTAL SLIDE VERTICAL LIFT VERT...

Page 6: ...ent fig 11 GATEARRANGEMENT The first thing to check is that the gate is in good running order as follows a The gate is rigid and straight and runs smoothly throughout its travel b That the inferior sl...

Page 7: ...ICAL FEATURES Power supply Motor power supply Power Absorbed current Thrust force Leaf speed pinion Z20 Use rate Max gate weight Max gate opening Type of limit switch Operating temperatures Operator w...

Page 8: ...the gate from derailment Fig 16 4 TYPE OF INSTALLATION 3 TYPICAL INSTALLATION 1 Operator 2 Concrete to build operator on 3 Photocells 4 Safety edge 5 Key switch 6 Travel gate stops 7 Radio receiver 8...

Page 9: ...d in that portion of the adjacent fence that the gate covers in open position 5 5 Follow the local building code to determine the required depth of the concrete pad 5 6 SEArecommend the following pad...

Page 10: ...ain with the provided tie rod Fig 22 Fig 22 Fig 23 7 2 Install the chain making it pass through the pinion group as in Fig 24 The chain must be always in line both vertically and orizontally if not pe...

Page 11: ...nal screw the limit switch casing 8 4 To install and adjust the limit switches in opening release the operator open the gate manually act on the adjusting screw so that the microswitch can activate th...

Page 12: ...ower 120V before servicing the operator RELEASE Fig 30 Fig 31 Fig 32 Fig 33 SEA recommend to release the operator only in case of power failure Always contact a pro fessional installer in case of malf...

Page 13: ...TING Fig 34 Fig 37 Fig 38 Fig 39 Fig 36 Fig 35 Note The antenna must be connected on the clamps 1 and 2 of the control unit CN1 connector For further information on the antenna wiring diagram please r...

Page 14: ...arantee will be void and the manufacturer responsability will be nullified if SEAUSAInc original spare parts are not being used The electrical installation shall be carried out by a professional techn...

Page 15: ...l be refused Customers must contact SEAfor instructions WARRANTY for the original buyer only Hydraulic and oil bath motors 36 months warranty from the date of invoice on manufacturing assembling and w...

Page 16: ...SEA USA Inc 10850 N W 21st unit 160 DORAL MIAMI Florida FL 33172 Phone 1 305 594 1151 Toll Free 800 689 4716 www sea usa com sales sea usa com...

Reviews: