background image

Sistemi Elettronici

di Apertura Porte e Cancelli

International registered trademark n. 804888

®

Fig. 52

SEA   can not be deemed responsible for any damage or 
accident caused by product breaking, being damages or 
accidents due to a failure to comply with the instructions herein. 
Read the general instructions attentively.

SAFETY GATE

For a correct and safe installation it is strongly recommended to 
install a Safety Gate, 

which allows the fulfilment of the force 

diagram included in the norm EN 12453 

and consequently the 

test and start of the whole installation.

Fig. 53

ENGLISH

17. PERIODICAL MAINTENANCE

Check the oil level
(Trasparent cap n.14 in Fig. 3)

Annual

Change the oil

Verify the functionality of the by-pass valves 
(check the force in opening and closing)
Check the release function

Verify the slowdown regulation (where present)

Check the correct drain of the rainwater
Check the integrity of the connection cables

Grease all the moving parts

Grease the rotation axis of the box as in Fig.50

4 years

Annual

Annual

Annual

Annual
Annual
Annual

Annual

SAFETY GATE

SAFETY PRECAUTIONS:

All electrical work should conform to current regulations. A 16 A   
0,030 A differential switch must be incorporated into the source 
of the operators main electrical supply and the entire system 
properly earth bonded. Always run mains carrying cables in 
separate ducts to low voltage control cables to prevent mains 
interference.

SPARE PARTS:

To obtain spare parts contact:

SEA S.p.A. - Zona Ind.le, 64020 S. ATTO   Teramo   Italia

SEA

 

reserves the right to do changes or variations that may be 

necessary to its products with no obligation to notice.

18. ACCESSORIES 

FOR 

JACK

CARRYING BOX INOX 

 

RELEASE

 RELEASE PLUS

KIT MECHANICAL STOP

22

67411740

REV 01 - 03/2015

Summary of Contents for JACK 1200

Page 1: ...eramo ITALY Tel 0861 588341 r a Fax 0861 588344 Sistemi Elettronici di Apertura Porte e Cancelli International registered trademark n 804888 67411740 Operatore oleodinamico interrato Underground hydra...

Page 2: ...ons with slow down only The wheeling unit is composed by a double piston connected to a rack which engages with the pinion of the leaf dragging shaft Gates up to 2 meters long can be securely locked u...

Page 3: ...er hinge alone is sufficient to install the unit those which are unnecessary can be eliminated the lower and that in the middle if exists E as the limit switches are not provided within the actuator i...

Page 4: ...a level to make it perfectly horizontal to the ground Fig 10 and perpendicular to the axis of the gate Fig 11 Hydraulic tubes sheath Hydraulic unit Pivot Bush U shaped bar Leaf 4 MOUNTING OF THE LEAF...

Page 5: ...xis of the jack 5 H Y D R A U L I C U N I T B O X WA L L INSTALLATION Fig 19 5 1 Connect the hydraulic tubes with the hydraulic unit and the jack Fig 21 Fig 22 Fig 23 After having installed the box th...

Page 6: ...o g F Yellow e t n m t s i u n j d c a lo e s c r i n o g F Braking regulation screw Opening closing Blocking screw for braking regulation 17 67411740 Copper tube Flexible tube 6 BLEED CAPREPLACEMENT...

Page 7: ...m the hydraulic circuit until non emulsified oil appears d tighten the air bleed screw before the operator completes the opening cycle e command closing of the gate f during closing of the gate loosen...

Page 8: ...ong the surface of the contact avoiding the welding next to the threaded holes Fig 32 10 4 Introduce the buckle of creeping in the box and fix it with the special screws Fig 33 10 5 Insert the units a...

Page 9: ...th the mechanical stops Kit N B If the Jack is not installed immediately but in a second time it is recommended to weld the crank shaft and the crank during the installation of the Jack Carry out the...

Page 10: ...XAMINATION The points pointed by arrows in Fig 52 are potentially dangerous The installer must take a thorough risk examination to prevent crushing conveying cutting grappling trapping so as to guaran...

Page 11: ...he release function Verify the slowdown regulation where present Check the correct drain of the rainwater Check the integrity of the connection cables Grease all the moving parts Grease the rotation a...

Page 12: ...against the external of the release making come out the handle of the lock until it reaches the stop Fig 57 Move the leaf and make return the handle of the release in its original position and extract...

Page 13: ...iportata sull operatore La garanzia di base 36 mesi sar estesa per ulteriori 24 mesi fino ad un totale di 60 mesi qualora venga acquistato il certificato di garanzie che dovr essere compilato e risped...

Page 14: ...the operator PLATINUM The mechanical components of the operators belonging to this line are guaranteed for 36 months from the date of manufacturing written on the operator The base warranty 36 months...

Page 15: ...sed by improper use or different use in respect to the intended one 4 The mechanical parts must be comply with Directives Machine Regulation 2006 42 CE and following adjustments Low Tension 2006 95 CE...

Page 16: ...ando la puerta est completamente abierta 15 Todo el mantenimiento reparaci n o controles deber n ser realizados por personal cualificado Evitar cualquier intente a reparar o ajustar En caso de necesit...

Page 17: ...highest quality levels and for your complete satisfaction Thanks for choosing SEA Este articulo ha sido producido siguiendo rigidos procedimientos de elaboracion y ha sido probando singolarmente a fi...

Page 18: ..._________________________________ Nome e Cognome First and Family Name_________________________________ Indirizzo Address ____________________________________________________ INSTALLATORE INSTALLER Fi...

Page 19: ......

Page 20: ...A Zona industriale 64020 S ATTO Teramo ITALY Tel 0861 588341 r a Fax 0861 588344 www seateam com seacom seateam com Sistemi Elettronici di Apertura Porte e Cancelli International registered trademark...

Reviews: