background image

EN

 

Wiring scheme 

PV 

MODULE 

BATTERY 

LOAD 

BATTERY TEMPERATURE SENSOR 

Minimum distance 

10 Cm 

Recommended pairs of copper wire that guarantee a maximum 

voltage drop of 1.5% of the battery nominal voltage. 

 

12V 

battery nominal voltage 

Wire section

 

2.5 

mm

mm

mm

10 

mm

M

a

x.  l

en

g

th

  

wi

res 

co

u

p

le 

[m]

C

u

rr

en

5 A 

2.6 

4.2 

6.3 

10.4 

10 A 

1.3 

2.1 

3.1 

5.2 

20 A 

0.9 

1.4 

2.1 

3.5 

24V 

battery nominal voltage 

Wire section

 

2.5 

mm

mm

mm

10 

mm

M

a

x.  l

en

g

th

  

wi

res 

co

u

p

le 

[m]

C

u

rr

en

5 A 

5.2 

8.4 

12.5  20.9 

10 A 

2.6 

4.2 

6.3 

10.4 

20 A 

1.7 

2.8 

4.2 

7.0 

Pic.2 Wiring scheme 

1) Install 

ESUN PLUS BOOST

 in a dry and adequately ventilated place; it must be fixed on a non-flammable surface and

 placed

so 

to leave an unobstructed space of at least 10cm around the device that allows the cooling by natural air convection. 

2) Connect respectively: load, sensor for battery temperature measure (supplied), PV module and, last, the battery as in

the 

 

scheme 

 

Pic.2

 

When 

 

you 

 

connect 

 

the 

 

battery 

 

the 

 

charge 

 

controller 

 

turns 

 

on 

 

and 

 

it 

 

begins 

 

to 

 

work.

 

Use proper cable sections as indicated in 

Pic.2

3) ESUN PLUS BOOST recognizes automatically the battery nominal voltage (12V or 24V) and it adapts consequently its

threshworkingolds. The user must configure the kind of battery in use to adequate the right charge voltage (Veoc). You have

 to 

 

set SEAL configuration if you use VRLA or GEL sealed batteries, while you have to choose FLOOD configuration if you use 

 

flooded lead acid batteries. If you use lithium-ionn (

Tab.2

). 

4) Set the proper load management program to your own application (

Tab.2

).

Testing 

Once made the connections as in 

Pic.2 

it is necessary to proceed with the testing of the system. 

1) With the PV module exposed to sunrays, verify that 

ESUN PLUS BOOST

 is charging the battery reading the values of

 charge

current Ipan and Ibatt (see 

Tab.1

). 

2) To  verify  that  the  battery  temperature  sensor  has  been  properly  connected,  check  on  the  LCD  that  at  the  page

“battery temperature” a reliable temperature value is displayed (

Tab.1

).

3) Verify the correct turning on of the load. If the load is ON only during night, it is possible to simulate the night by

disconnecting temporarily one of the wires of the PV module. With load ON, check the absorbed current by reading in 

the proper page of LCD (

Tab.1

). 

WARNING! 

Do  not  connect  to  the 
output  loads  that  draw 
more 

than 

15A 

as 

inverters.

 

Summary of Contents for E-SUN PLUS BOOST

Page 1: ...E SUN PLUS BOOST SOLAR MPPT CHARGE CONTROLLER Manuale utente User manual Manuel de l utilisateur Manual del usuario Benutzerhandbuch IT DE ES EN FR 67410218 Rev 00 08 22 ...

Page 2: ...ower supply video cameras that have to work only during the day or to power supply flashing systems road signs that have to work only during night or to power supply lighting systems that have to work only for a certain number of hours during night ESUN PLUS BOOST detects the day night status according to the PV module s voltage therefore it is not necessary to connect further sensors to the contr...

Page 3: ...y to place a fuse of adequate current on the battery cable as close as possible to the positive battery terminal Warranty The defective product must be returned to SEA S p A for assistance at the expense of the customer along with a copy of the sales invoice both for repairing and guaranteed replacement The costs of re installation of the material will be borne by the customer Warranty does not co...

Page 4: ...pts Vpan and Ipan respectively voltage and current of the PV module so to search the condition in which the power that is given by the PV module is maximum thus realizing the MPPT Maximum Power Point Tracking In addition it manages the battery charge by reducing the current sent towards the battery when the battery Vbatt exceeds its charge voltage Veoc 2 Circuit for load control it turns on off th...

Page 5: ...SUN PLUS BOOST recognizes automatically the battery nominal voltage 12V or 24V and it adapts consequently its threshworkingolds The user must configure the kind of battery in use to adequate the right charge voltage Veoc You have to set SEAL configuration if you use VRLA or GEL sealed batteries while you have to choose FLOOD configuration if you use flooded lead acid batteries If you use lithium i...

Page 6: ...8 8V 24V and even with a good lighting of the PV module you have low charge currents since the controller limits such current so to avoid the battery overcharge button PV module voltage Vpan button It displays the power in watt actually delivered by the PV module button It displays the counter of energy that is delivered by the PV module in KWh It is possible to reset this measure pressing simulta...

Page 7: ...s but the charge voltage is equal for every temperature measured Charge voltage relating to each one of the programs are indicated in the following Pic 3 Tab 4 and must be chosen in accordance with the battery manufacturer indications Page change Low Battery voltage configuration page It sets the intervention voltage of Low Battery protection load detachment in case of low battery When pressing th...

Page 8: ...r when internal temperature of ESUN PLUS BOOST exceeds 80 C and deactivates the charge You exit automatically from this protection when the internal temperature goes below the threshold of 50 C note the internal temperature of the charge controller is not displayed on the LCD If you see often this protection we advise to place the device in a cooler place Overload protection occurred The load curr...

Page 9: ...ure C End charge voltage Volt SEAL FLOOD End charge voltage according to temperature 24V system 27 0 27 5 28 0 28 5 29 0 29 5 30 0 30 5 31 0 31 5 32 0 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 Temperature C End charge voltage Volt SEAL FLOOD Pic 3 Compensation curve of Veoc charge voltage according to battery temperature Dimensions Pic 4 Dimensions ...

Page 10: ...b 10 8V 11 4V default 12 2V 21 6V 22 8V default 24 4V Output voltage from low battery settable Velb 12 4V 13 8V default 13 8V 24 8V 27 6V default 27 6V Solar modules threshold voltage for day detection settable Vday 12 4V 13 8V default 13 8V 24 8V 27 6V default 27 6V Solar modules threshold voltage for night detection Vnight Vday 1 3V Vnight 0 6V 8 3V 0 6V 8 3V Float phase voltage settable Vflt 13...

Page 11: ...__________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ _______________________________________...

Page 12: ......

Reviews: