Table of Contents
vii
4.4.
U
NPACKING THE
B
ASE
F
RAME AND
R
EFLECTOR
C
RATE
......................................................................................................................... 4-6
4.4.1.
Installing the Ku-Band Co-Pol/Cross-Pol Feed Assembly .................................................................................... 4-9
4.5.
U
NPACKING THE
P
EDESTAL
C
RATE
.......................................................................................................................................................... 4-13
4.6.
U
NPACKING THE
R
ADOME
C
RATE
: ........................................................................................................................................................... 4-15
4.7.
A
SSEMBLING THE
ADE ............................................................................................................................................................................... 4-15
4.7.1.
Preparing for Assembly of the ADE .............................................................................................................................. 4-15
4.7.2.
Sub-assemble the Base Frame Assembly ................................................................................................................... 4-16
4.7.3.
General Subassembly Guidance ...................................................................................................................................... 4-18
4.7.4.
Sub-assemble the 168” Radome Assembly ............................................................................................................... 4-18
4.7.5.
Sub-assemble the Antenna Pedestal ............................................................................................................................ 4-29
4.7.6.
Installing the Marine Air Conditioner .......................................................................................................................... 4-31
4.7.7.
Close the 144” Radome Assembly ................................................................................................................................. 4-32
4.7.8.
Prepare the 168” Radome ADE for Lift ........................................................................................................................ 4-34
4.8.
I
NSTALLING
T
HE
ADE ................................................................................................................................................................................ 4-35
4.8.1.
Hoist ............................................................................................................................................................................................... 4-35
4.8.2.
Install Antenna/Radome/Baseframe ............................................................................................................................ 4-35
4.9.
I
NSTALLING THE
B
ELOW
D
ECKS
E
QUIPMENT
. ........................................................................................................................................ 4-35
4.9.1.
General Cautions & Warnings .......................................................................................................................................... 4-35
4.9.2.
Preparing BDE Location ...................................................................................................................................................... 4-35
4.9.3.
System Configuration ........................................................................................................................................................... 4-36
4.9.4.
Installing the Below Deck Equipment ......................................................................................................................... 4-36
4.10.
C
ONNECTING THE
B
ELOW
D
ECKS
E
QUIPMENT
...................................................................................................................................... 4-37
4.10.1.
Connecting the ADE AC Power Cable .......................................................................................................................... 4-37
4.10.2.
Connecting the BDE AC Power Cables ........................................................................................................................ 4-37
4.10.3.
Connecting the ADE IF Coaxes ...................................................................................................................................... 4-37
4.10.4.
Connect the Modem TXIF Coax ..................................................................................................................................... 4-37
4.10.5.
Antenna Control Unit Connections ............................................................................................................................... 4-37
4.10.6.
Radio Control Serial Cable ................................................................................................................................................. 4-38
4.10.7.
Terminal Mounting Strip (TMS) Connections .......................................................................................................... 4-38
4.10.8.
Other BDE connections ....................................................................................................................................................... 4-41
4.11.
F
INAL
C
HECKS
.............................................................................................................................................................................................. 4-41
4.11.1.
Visual/Electrical inspection ................................................................................................................................................ 4-41
4.11.2.
Electrical - Double check wiring connections .......................................................................................................... 4-41
4.12.
P
OWER
-U
P
.................................................................................................................................................................................................... 4-41
4.13.
C
ABLE
T
ERMINATIONS
............................................................................................................................................................................... 4-41
4.13.1.
At The Radome ......................................................................................................................................................................... 4-41
4.13.2.
ACU & TMS ................................................................................................................................................................................. 4-42
4.13.3.
Other BDE ................................................................................................................................................................................... 4-42
4.14.
F
INAL
A
SSEMBLY
......................................................................................................................................................................................... 4-42
4.14.1.
Remove Stow Braces/Restraints...................................................................................................................................... 4-42
4.14.2.
Verify all assembly and Wiring connections ............................................................................................................. 4-42
4.15.
P
OWER
-U
P
T
HE
ADE .................................................................................................................................................................................. 4-42
4.15.1.
Initialization............................................................................................................................................................................... 4-42
4.15.2.
Home Flag Position................................................................................................................................................................ 4-42
4.15.3.
BDE ................................................................................................................................................................................................. 4-42
4.15.4.
Balancing the Antenna ......................................................................................................................................................... 4-42
4.15.5.
Fine Balance and Monitoring Motor Drive Torque ............................................................................................... 4-43
Summary of Contents for 9711-44 KU-BAND TX/RX
Page 3: ......
Page 12: ...Table of Contents xii This Page Intentionally Left Blank ...
Page 24: ...Site Survey 9711 44 Ku Band TXRX 2 8 This Page Intentionally Left Blank ...
Page 64: ...Installation 144 Radome 9711 44 Ku Band TXRX 3 40 This Page Intentionally Left Blank ...
Page 112: ...Basic Setup of the ACU 9711 44 Ku Band TXRX 5 4 This Page Intentionally Left Blank ...
Page 114: ...Setup Ships Gyro Compass 9711 44 Ku Band TXRX 6 2 This Page Intentionally Left Blank ...
Page 116: ...Setup Band Select 9711 44 Ku Band TXRX 7 2 This Page Intentionally Left Blank ...
Page 122: ...Setup Home Flag Offset 9711 44 Ku Band TXRX 9 4 This Page Intentionally Left Blank ...
Page 130: ...Setup Searching 9711 44 Ku Band TXRX 11 6 This Page Intentionally Left Blank ...
Page 150: ...Antenna Specific Operation 9711 44 Ku Band TXRX 16 4 This Page Intentionally Left Blank ...
Page 154: ...Functional Testing 9711 44 Ku Band TXRX 17 4 This Page Intentionally Left Blank ...
Page 158: ...Installation Troubleshooting 9711 44 Ku Band TXRX 18 4 This Page Intentionally Left Blank ...
Page 180: ...Maintenance 9711 44 Ku Band TXRX 19 22 This Page Intentionally Left Blank ...
Page 198: ...Drawings 9711 44 Ku Band TXRX 23 2 This Page Intentionally Left Blank ...
Page 205: ......
Page 210: ......
Page 218: ......
Page 230: ......
Page 231: ......
Page 242: ......
Page 243: ......
Page 252: ......
Page 254: ......
Page 256: ......