
9497B-21 C/Ku-Band TVRO
Installation
4-15
4.5.7.
Refer to the Radome Assembly drawing for your system and the procedure below.
Close the 144” Radome Assembly
1.
Lift Upper section up over the dish &
feed assembly and set it down onto
the lower section.
2.
Set the upper section onto the top of
the lower panels.
3.
Loosely attach the upper panels to the
lower panels using the hardware
provided. Do NOT tighten the bolts at
this time.
Summary of Contents for 9497B-21
Page 3: ......
Page 40: ...Setup 9497B 21 C Ku Band TVRO 5 4 This Page Intentionally Left Blank ...
Page 78: ...Model 9497B 21 Drawings 9497B 21 C Ku Band TVRO 9 2 This Page Intentionally Left Blank ...
Page 80: ......
Page 83: ......
Page 86: ......
Page 88: ......
Page 90: ......
Page 97: ......
Page 98: ......
Page 102: ......