Installation
9497B-21 C/Ku-Band TVRO
4-10
15.
Clean off excess caulking.
16.
The upper section of the
radome is now complete.
17.
Place short pieces of 2”x4”
boards under the perimeter of
the radome top to raise it up
off of the ground.
18.
Attach radome lifting brackets
(PN 122848), or other lifting
arrangement, around the
bottom of the upper panel
assembly.
19.
Insert a 1” (or longer) bolt
through a fender washer,
down through the bottom
flange of one of the upper
panels and thread it into the
threaded lip of the lifting
bracket as shown in the
picture.
20.
Attach three more brackets, in
the same manner, so that the
lifting brackets are in four
equidistant points around the
perimeter of the bottom
flange of the
NOTE:
Let the person who was
working inside the upper half of the
radome out. Attach web straps to the
four lifting points.
21.
The upper panel assembly is
now ready to lift onto the
lower panels.
4.5.4.
Sub-assemble the bottom panels onto the base frame
NOTE:
Unless otherwise indicated, all nuts and bolts should be assembled
with Loctite 242 or its equivalent.
Summary of Contents for 9497B-21
Page 3: ......
Page 40: ...Setup 9497B 21 C Ku Band TVRO 5 4 This Page Intentionally Left Blank ...
Page 78: ...Model 9497B 21 Drawings 9497B 21 C Ku Band TVRO 9 2 This Page Intentionally Left Blank ...
Page 80: ......
Page 83: ......
Page 86: ......
Page 88: ......
Page 90: ......
Page 97: ......
Page 98: ......
Page 102: ......