14400MK2-21 C/Ku-Band TVRO
Maintenance and Troubleshooting
6-27
4.
Hook the other end hook of the nylon strap to the pedestal-
mounting frame as shown in Figure 3.
5.
Use the ratchet of the strap to tighten nylon straps. As the
straps are tightened, observe the vertical isolation canister
assembly as shown in Figure 4.
6.
Tighten straps until the canister has been pulled down
approx. ¼ to ½ inch. Do not over-tighten. You must leave
approximately 1/8 inch clearance between the rubber stops
and the azimuth driven sprocket to allow the vertical
vibration isolation to function properly.
NOTE:
Remove both the straps and the bolts
before applying power
and returning the antenna
to normal operating condition.
Summary of Contents for 14400MK2-21
Page 3: ......
Page 8: ...Table of Contents viii This Page Intentionally Left Blank ...
Page 34: ...Installation 14400MK2 21 C Ku Band TVRO 3 22 This Page Intentionally Left Blank ...
Page 38: ...Setup 14400MK2 21 C Ku Band TVRO 4 4 This Page Intentionally Left Blank ...
Page 76: ...Model 14400MK2 21 Drawings 14400MK2 21 C Ku Band TVRO 8 2 This Page Intentionally Left Blank ...
Page 81: ......
Page 84: ......
Page 86: ......
Page 89: ......
Page 90: ......
Page 103: ......
Page 104: ......
Page 105: ......