Table of Contents
v
1.
INTRODUCTION .......................................................................................................................................................................................... 1-1
1.1.
G
ENERAL
D
ESCRIPTION OF SYSTEM
................................................................................................................................................................. 1-1
1.2.
P
URPOSE
.................................................................................................................................................................................................................. 1-1
1.3.
S
YSTEM
C
OMPONENTS
........................................................................................................................................................................................ 1-1
1.4.
G
ENERAL SCOPE OF THIS MANUAL
.................................................................................................................................................................... 1-2
1.5.
Q
UICK
O
VERVIEW OF CONTENTS
...................................................................................................................................................................... 1-2
2.
OPERATION ..................................................................................................................................................................................................... 2-1
2.1.
S
YSTEM
P
OWER
-
UP
.............................................................................................................................................................................................. 2-1
2.2.
A
NTENNA
I
NITIALIZATION
................................................................................................................................................................................ 2-1
2.3.
A
NTENNA
S
TABILIZATION
................................................................................................................................................................................. 2-1
2.4.
S
TABILIZED
P
EDESTAL
A
SSEMBLY
O
PERATION
............................................................................................................................................. 2-1
2.5.
T
RACKING
O
PERATION
........................................................................................................................................................................................ 2-1
2.6.
A
NTENNA
P
OLARIZATION
O
PERATION
............................................................................................................................................................ 2-1
2.7.
L
OW
N
OISE
B
LOCK
C
ONVERTER
O
PERATION
................................................................................................................................................. 2-2
2.8.
R
ADOME
A
SSEMBLY
O
PERATION
...................................................................................................................................................................... 2-2
3.
INSTALLATION ............................................................................................................................................................................................. 3-1
3.1.
G
ENERAL
C
AUTIONS
&
W
ARNINGS
................................................................................................................................................................. 3-1
3.2.
S
ITE
S
ELECTION
A
BOARD
S
HIP
......................................................................................................................................................................... 3-2
3.3.
P
REPARING
F
OR
T
HE
I
NSTALLATION
................................................................................................................................................................ 3-2
3.3.1.
Unpack Shipping Crates .............................................................................................................................................................. 3-2
3.3.2.
Inspect / Inventory ........................................................................................................................................................................ 3-2
3.3.3.
Prepare ADE Mounting Location ........................................................................................................................................... 3-2
3.3.4.
Preparing BDE Location .............................................................................................................................................................. 3-2
3.3.5.
Installing The System Cables .................................................................................................................................................. 3-3
3.4.
A
SSEMBLING THE
ADE........................................................................................................................................................................................ 3-3
3.4.1.
Preparing for Assembly of the ADE ..................................................................................................................................... 3-3
3.4.2.
Sub-assemble the Base Frame Assembly ......................................................................................................................... 3-3
3.4.3.
Sub-assemble the 168” Radome Assembly ..................................................................................................................... 3-5
3.4.4.
Sub-assemble the Antenna Pedestal ................................................................................................................................ 3-13
3.4.5.
Close the 168” Radome Assembly ..................................................................................................................................... 3-16
3.4.6.
Prepare the 168” Radome ADE for Lift ........................................................................................................................... 3-18
3.5.
I
NSTALLING
T
HE
ADE ...................................................................................................................................................................................... 3-19
3.5.1.
Hoist ..................................................................................................................................................................................................... 3-19
3.5.2.
Install Antenna/Radome/Baseframe ................................................................................................................................ 3-19
3.6.
I
NSTALL
BDE
E
QUIPMENT
.............................................................................................................................................................................. 3-20
3.6.1.
ACU & TMS ...................................................................................................................................................................................... 3-20
3.6.2.
Other BDE Equipment ............................................................................................................................................................... 3-20
3.7.
C
ABLE
T
ERMINATIONS
..................................................................................................................................................................................... 3-20
3.7.1.
At The Radome .............................................................................................................................................................................. 3-20
3.7.2.
ACU & TMS ...................................................................................................................................................................................... 3-20
3.7.3.
Other BDE Equipment ............................................................................................................................................................... 3-20
3.8.
F
INAL
A
SSEMBLY
............................................................................................................................................................................................... 3-20
3.8.1.
Remove Stow Braces/Restraints .......................................................................................................................................... 3-20
3.8.2.
Verify all assembly and Wiring connections ................................................................................................................ 3-20
3.8.3.
Balance Antenna Pedestal ...................................................................................................................................................... 3-20
3.9.
P
OWER
-U
P
T
HE
ADE ....................................................................................................................................................................................... 3-20
3.9.1.
Initialization .................................................................................................................................................................................... 3-20
Summary of Contents for 14400MK2-21
Page 3: ......
Page 8: ...Table of Contents viii This Page Intentionally Left Blank ...
Page 34: ...Installation 14400MK2 21 C Ku Band TVRO 3 22 This Page Intentionally Left Blank ...
Page 38: ...Setup 14400MK2 21 C Ku Band TVRO 4 4 This Page Intentionally Left Blank ...
Page 76: ...Model 14400MK2 21 Drawings 14400MK2 21 C Ku Band TVRO 8 2 This Page Intentionally Left Blank ...
Page 81: ......
Page 84: ......
Page 86: ......
Page 89: ......
Page 90: ......
Page 103: ......
Page 104: ......
Page 105: ......