
F22L0IY
1
1. Stern eyelets
13) Boarding Pads
Provide a cushioned surface for the
knees when boarding.
14) Rear Platform
Provides a large surface to position
your feet in the “vert“ configuration.
It also provides a convenient surface
for easy boarding.
15) Cooling System Bleed
Outlet
1
F22L0HZ
1. Bleed outlet
When engine is running, water should
flow out of the outlet. This allows air
in engine cooling system to escape. It
also confirms that water is circulating
in the cooling system.
NOTE:
It may be required to increase
slightly the engine RPM to see the wa-
ter flowing out.
CAUTION: Should water not flow
from outlet a few seconds after en-
gine starts, immediately stop en-
gine and refer to POST-OPERATION
CARE and look for COOLING SYS-
TEM FLUSHING or refer to an au-
thorized Sea-Doo dealer for servic-
ing.
16) Flushing Connector
A convenient connector is provided
to allow easy installation of a garden
hose to flush the cooling system.
F22J01Y
1
1. Flushing connector
Refer to
POST-OPERATION CARE
section for proper use.
17) Bilge Drain Plugs
Should water be found in the bilge, it
can be easily drained by unscrewing
the drain plugs when engine is off and
watercraft is out of the water.
CAUTION: Always take the water-
craft out of the water prior to un-
screwing drain plugs.
F22J01Z
1
2
3
1. Drain plugs
2. Tighten
3. Unscrew
38
______________________
Summary of Contents for 2006 3D RFI
Page 8: ...6 _______________________ ...
Page 9: ...SAFETY INFORMATION ____________ SAFETY INFORMATION ____________ 7 ...
Page 27: ...VEHICLE INFORMATION _____________________ 25 ...
Page 72: ...70 ______________________ ...
Page 73: ...MAINTENANCE INFORMATION _____________________ 71 ...