17.
51 Ah units: measure the voltage for the three columns with real batteries.
18.
Put the leads of an ohmmeter on either end of each fuse to make sure that they have
a value of near 0. There is a small internal resistance of approximately 0.5 ohms.
19.
Connect the two-wire connector on the PCB assembly to the connector on the end
flange.
20.
51 Ah units: connect the three-wire connector on the PCB assembly to the connector
on the end flange.
21.
Replace the desiccant pack.
22.
Carefully install the end flange into the pressure housing. Make sure that the O-rings
are not twisted and the wires are not pinched.
23.
Install the 10-32 screws again to attach the end flange to the pressure housing.
Operation and maintenance
8