System Operation Manual
SAT-DN-00434, Rev. B
LOBO
2017-05-16
Page 86 of 86
Copyright
2017 Sea-Bird Scientific. All rights reserved.
17.
If you did not select a priming sequence, you will be presented with a warning that you are using
non-recommended settings. Select yes to proceed, or go back and select a priming sequence time.
18.
You will then be asked if you wish to generate a settings report. Select Yes and save the report.
19.
The Cycle is now ready for deployment. Disconnect the cable and power source, and remount the
Cycle on the LOBO frame. Reconnect the STOR-X to Cycle cable. Remember that the Cycle gets
power directly from the STOR-X battery POWER connector, so ensure that it is disconnected so
that the Cycle does not attempt to operate (i.e. prime itself) unexpectedly.