![SE Controls FCS12001030 Technical Information And Operating Instructions Download Page 5](http://html1.mh-extra.com/html/se-controls/fcs12001030/fcs12001030_technical-information-and-operating-instructions_1220618005.webp)
+44 (0)1543 443060
www.secontrols.com
Please keep these operating instructions for future reference and maintenance.
Subject to technical modifications. Diagram is not binding.
5
1.5.
Maintenance
A smoke control system should be checked
and serviced periodically in accordance
to local smoke control legislation.
Smoke control systems have to be serviced and
checked for defects at least once per year by an
authorised, trained and competent person.
Within the UK a suitable service contract
with SE Controls is recommended for this
purpose (see page 7 for contact information).
All batteries need to be checked to see if
they are within specification and in good
condition at least once a year and replaced
at least every FOUR YEARS (please observe
the battery commissioning label).
Ensure that supply voltage and batteries are
disconnected before any maintenance work or
mechanical/ electrical alterations are made.
The system must be protected
against unintentional start-up!
After maintenance, modification or repair
the system must be functionally retested.
Compatibility; this equipment should only
be used to operate with motors and other
products approved by SE Controls. No liability
will be accepted and neither guarantee nor
service is provided if unapproved products are
used in conjunction with this equipment.
1.6.
Installation and Connection
Installation should be carried out by an
authorised, trained and competent electrician.
Ensure correct cable type is used throughout the
installation. All low voltage cables are to be routed
separately from mains voltage cables and other
electrically noisy cables. Flexible cables must not
be plastered over and freely suspended cables
must be provided with strain relief. Cables must
be installed in such a way that they cannot be
sheared, twisted, pierced or otherwise damaged
during installation or use. Junction boxes should
be accessible for inspection and maintenance.
Do not attempt to install or alter
the installation of the panel whilst
connected to the power supply.
1.7.
Fault Finding
In the unlikely event that a problem occurs
with the control panel, users are urged to
contact SE Controls for assistance.
If the system operates from mains power
but when mains power is removed will not
operate from batteries, it is possible that
the batteries will require replacement.
There are no user repairable parts. Fault
rectification must only be carried out by
authorised and competent persons.
1.8.
Contact Information
For sales, technical support and
maintenance please contact:
SE Controls
Lancaster House
Wellington Crescent
Fradley Park
Lichfield
Staffordshire
WS13 8RZ
Tel:
01543 443060
Fax:
01543 443070
Website:
www.secontrols.com
1.9.
Certification
SE Controls hereby certify that the parts and
services detailed hereon have been manufactured,
inspected, tested and supplied in accordance with
the conditions and requirements of the procedures
as documented in the Company Quality Assurance
System to ensure conformance with SE Controls’
specifications, and with the contract or order
conditions of our BS EN ISO9001:2008 registration.
1.10. EN12101-10:2005 Certification
Our equipment is built and tested in accordance
with EN12101-10:2005 requirements.
Certification can be provided upon request.