+44 (0)1543 443060
www.secontrols.com
Please keep these operating instructions for future reference and maintenance.
Subject to technical modifications. Diagram is not binding.
2
Contents
Content
3. Connections
10
3.1. Power and
control connections
10
3.2. Actuator
connections
11
3.3. Manual
Control Points
12
3.4. Fire Alarm Inputs
(FRA, ARA, SMK)
14
3.5. Smoke
Detectors (SMK)
15
3.6. Day to Day
Switch (DYO, DYC)
16
3.7. Thermostat (TST)
17
3.8. BMS Analogue
Input (AI1)
18
3.9. Rain Sensor (RNS)
19
3.10. Network
Connection (NTA,
NTB, SCR)
20
4. System Design
21
4.1. System Design
21
4.2. Design checklist
for each PSU Panel:
21
4.3. Design checklist
for each MCP:
21
4.4. Design checklist
for each actuator/vent
21
Content
5. Installation,
Commissioning
and Fault finding
22
5.1 Fixing
22
5.2 Low voltage
connections
22
5.3. Mains Connection
23
5.4. Battery installation 24
5.5. First power-
up tests.
24
5.6. Basic Fault Finding
25
5.7. Battery
Replacement
26
6. Wiring Schematics 27
6.1. 30A PSU Panel
27
6.2. 60A PSU Panel
28
6.3. 90 PSU Panel
29
Content
1. General
Information
4
1.1. General Safety
Information
4
1.2. Health and Safety
4
1.3. Environment
4
1.4. User
Responsibilities
4
1.5. Maintenance
5
1.6. Installation
and Connection
5
1.7. Fault Finding
5
1.8. Contact
Information
5
1.9. Certification
5
1.10. EN12101-10:2005
Certification
5
2. Specification
6
2.1 Device Overview
6
2.2 PSU LED Status
6
2.3. PSU Jumper links
7
2.4. PSU Volt free
relay contacts
7
2.5. PNC Fuse Chart
8
2.6. PNC Internal
Control Board
Indicators
8
2.7. Recommended
Cables Types
9
2.8. Hierarchy
of Functions
9