
ZAA2300 ManualZAA2300 Manual
23. September 2021
© Copyright 2021, PROCEQ SA
14
1.
Start stop
2.
End stop
3.
Clamping grip
4.
Release lever
5.
Clamping device for the substrate
6.
Lifting and lowering device for weight (7)
7.
Weight
8.
Swivelling holders for fixing the base plate
9.
Holding device for wire-bars and profile rods
10.
Levelling feet
11.
Knurled screw
12.
Fixing screw of the holding device
13.
FWD-STOP-REV button
14.
SPEED buttons
15.
Operation light POWER
16.
Main switch
17.
Power supply 100 V
–
240 V / 50 Hz
–
60 Hz
18.
Delay action fuse 0.8 A / 250 V
19.
Isolation plate
20.
Back heating plate holder
21.
Front heating plate holder
22.
Drawing unit
23.
Temperature controller connection
24.
Hose connection for vacuum
(23)
(24)