5 .1 .2
Unpacking
EasyPREP BOD-300
may be attached to the packaging with bolts. Remove them prior to lifting the system out of the box. The system
weighs approximately 100 kg. Use two people to lift by the bottom frame and place the system on a flat surface where it will be used. Save the
packing material for further use.
5 .1 .3
Inspection
Ensure all of the parts are included in the shipment. There may be some accessories that have been packaged in the same box as
EasyPREP
BOD-300
. If damage is observed, contact the carrier to make a claim and then contact the Service Department.
5 .2 HARDWARE INSTAllATION GUIDElINES
BOD-300
requires installation in such a way that the ON/OFF button has a minimum clearance of 8 in. (20 cm)”
5 .2 .1
Installing The BOD Racks
Place the BOD racks on the top table, using the positioning pins provided on the top table to align them.
Bottle caps must be removed by hand prior to starting sequence, unless the BOD-300 decapping/capping accessory is installed. The
BOD-300 decapping/capping acccesory is not compatible with acrylic caps. BOD 65 ml, 300 ml PE bottle caps (010-420-020) must
be used with the decapping/capping accessory for 300 and 60 ml bottles.
5.2.2
Cable Connections
Make sure that the power button is turned off.
•
Connect the power cable to the receptacle located on the end of the X-arm. (Figure 2)
•
Connect the USB cable to the USB port located on the end of the X-arm. (Figure 2)
Do not connect the USB cable to the computer yet.
Figure 2. Power and USB ports
CAUTION
CAUTION
PoweR Switch
PoweR indicatoR
PoweR coRd FRom oUtlet
USB caBle FRom
comPUteR