SCOTTY DA-42 MPP Rack
Save the installation angled by pressing “Update Data to SRU” button. After
confirmation that the angles have been saved successfully, press “Next”.
Compass calibration starts. Press “Next”.
In the Connection dialog, select the “COM” port as before, and select
“Maintenance Port on SRU-7200”.
Press “Start clockwise rotation” and perform a clockwise 360° circle with the
aircraft. When the circle has been completed, press “Stop clockwise rotation”.
Maintenance Manual
33
Summary of Contents for DA-42 MPP Rack
Page 1: ...DA 42 MPP Rack Maintenance Manual ...
Page 4: ......
Page 8: ......
Page 16: ......
Page 24: ......