SCOTTY SS – INSTRUCTION MANUAL
Scotty SS
Nov-05
16
Items required:
1. Switching Relay R4222D 1013 (120 V Coil, 12 amp @ 120 Vac), or equivalent.
2. Junction box (4” x 4”) and cover.
3. Square extension box (4”x 4”gyproc extension).
4. Two plastic universal bushings or junction box connectors.
5. White wire (12”), two insulated spade connectors.
6. Black wire (6”), two insulated spade connectors.
7. Brown wire (12”), two insulated spade connectors.
8. Yellow wire (12”), two insulated spade connectors.
9. Two cabinet mounting screws.
INSTRUCTIONS
1. Turn off power to the oil furnace and wood furnace.
2. Mount the switching relay in a junction box, in the blower compartment near the
blower motor and motor wires. (If possible mount relay on rubber or foam pad to
reduce noise in ductwork).
3. Remove the white neutral wire from the blower motor, and connect it to a
selected neutral side of the relay coil.
4. Connect the white wire (item 2) to the second spade of the selected neutral side
of the relay coil, and the other end into the blower neutral wire location (where
initial white wire was removed).
5. Remove the black high-speed wire from the blower motor (this should be the
selected blower heating speed), and connect it to the power side of the relay coil
(no relay spade #).
6. Connect the black wire (item 3) to the second spade of the selected power side
of the relay coil, and the other end of the wire on to one side of the normally open
contacts (relay spade #1).
7. Connect the brown wire (item 4) to the high-speed connection on the blower
motor, and the other end of the wire on to the other side of the normally open
contacts (relay spade #3).
8. Remove the yellow low-speed wire from the blower motor (this should be the
selected low-speed in the furnace wiring box), and connect it to one side of the
normally closed contacts (relay spade #4).
9. Connect the yellow wire (item 5) to the low-speed connection on the blower
motor, and the other end of the wire on to the other side of the normally closed
contacts (relay spade #5).
10. Turn on power to the oil furnace and wood furnace. Check relay operation.
Summary of Contents for DB-202A
Page 11: ...SCOTTY SS INSTRUCTION MANUAL Scotty SS Nov 05 10 SECTION 2 INSTALLATION INSTRUCTIONS ...
Page 24: ...SCOTTY SS INSTRUCTION MANUAL Scotty SS Nov 05 23 SECTION 3 ADD ON TO OIL FURNACE ...
Page 29: ...SCOTTY SS INSTRUCTION MANUAL Scotty SS Nov 05 28 SECTION 4 ADD ON TO ELECTRIC FURNACE ...
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......