Scott 2015 PLASMA 5 Owner'S Manual Download Page 5

08

  

PLASMA 5

  |  BIKE OWNER’S MANUAL 2015

BIKE OWNER’S MANUAL 2015  |  

  

PLASMA 5

09

E

N

G

LI

S

H

E

N

G

LI

S

H

CABLE ROUTING:

 FOR ELECTRONIC SHIFTING

Front Derailleur (FD) & Rear Derailleur (RD) wires: 

Route the COMMAND electric wire (approx. 1000mm) down from the headtube long 
hole to the bottom bracket right hand housing. 

Route the FD wire (approx. 200mm) down from the frame front derailleur exit hole 
to the bottom bracket right hand housing. 

Route the RD wire (approx. 500mm) down from the frame right dropout exit hole to 
the bottom bracket right hand housing. 

Route the BATTERY wire (approx. 600mm) down the seattube to the bottom 
bracket right hand housing. 

Plug all wires to the junction box SM-JC41, insert the box into the frame through 
the bottom bracket right hand housing and make sure all wires will not disturb the 
bottom bracket assembly.

Rear Brake (RB) Cable Housing:

 

IMPORTANT

To avoid any damage to the frame structure put a housing end plug at the end of 

the housing. 

Place the housing into the headtube long hole, push the housing until it touches 
the rear end of the headtube (you may feel a resistance), orient the housing 
up and push the housing again, it will then follow the headtube down and 
continue its travel along the downtube, continue running the cable housing into 
the frame.

Once the housing is visible from the bottom bracket opening, lead the housing to the 
bottom bracket exit hole on the underside of the downtube in front of the bottom 
bracket. 

Pull the housing to leave approx. 100mm of cable housing outside the frame.

Front Brake (FB) Cable Housing:

 

refer to the Stem/Handlebar section.

Handlebar Command wiring:

 

route the wires into the Stem/Handlebar as described into the Stem/Handlebar 
section.

Route the FD COMMAND & RD COMMAND wires through the headtube cap part (905).

Route the COMMAND wire through the headtube cap part (905), connect the wires 
to the junction box SM-EW90-A, assemble the headtube cap part (905) as described 
into the Headset/Stem body section and zip-tie the junction box SM-EW90-A to either 
stem body or storage box.

 

Summary of Contents for 2015 PLASMA 5

Page 1: ...AL 2015 All rights reserved 2014 SCOTT Sports SA SCOTT Sports SA 17 Route du Crochet 1762 Givisiez Switzerland Distribution SSG Europe Distribution Center SA P E D Zone C1 Rue Du Kiell 60 6790 Aubange...

Page 2: ...ments should be done at your local SCOTT dealer or following to this manual CONTENT Plasma Concept 04 Geometry Technical Data Plasma 5 05 Plasma 5 Frameset Content 06 Specific Torques Values Table 06...

Page 3: ...ble plasma 4 and plasma 5 Shifting Mechanical and electrical shifting compatible S 51 M 54 L 57 XL 60 A HEAD TUBE ANGLE 72 0 73 0 73 0 73 5 B HEAD TUBE LENGTH 110 0 mm 4 3 in 138 0 mm 5 4 in 170 0 mm...

Page 4: ...M5 10mm headless screw available in any hardware shop 6 Front Brake 7 Brake Covers 8 Storage Box 9 Hydration System REAR DROP OUT AND REPLACEABLE DERAILLEUR HANGER Setup screw Dropout length can be s...

Page 5: ...end plug at the end of the housing Place the housing into the headtube long hole push the housing until it touches the rear end of the headtube you may feel a resistance orient the housing up and push...

Page 6: ...the headtube long hole RD housing left RB housing middle FD housing right push the housing until it touches the rear end of the headtube you may feel a resistance direct the housing up and push the ho...

Page 7: ...1 bearing 902 into the headtube upper bearing seat on top of the headtube make sure the outer diameter bearing chamfer is positioned upon the headtube bearing seat chamfer IMPORTANT Put the 1 compress...

Page 8: ...ttery mount parts 530 so that one of its shoulders sticks out of the parts Assemble the battery mount parts 530 with the seatpost 501 by pinching the upper end of the battery mounts and so that their...

Page 9: ...e extension slot and route the wire out through the extension rear end Connect the wire with a junction box SM JC40 41 and connect a COMMAND wire approx 150mm with the junction boxes SM JC40 41 Route...

Page 10: ...wo M6 screws and tighten them to the specified torque T6 Front Brake Cable assembly Install the front wheel in the fork tabs and position the front brake cable in front of the front brake calliper Usi...

Page 11: ...on the low part of the stem 301 and position the front brake cover over the front brake and secure it into position by tightening the front brake cover screw to the specified torque T8 Advisory There...

Page 12: ...238936 HYDRATION SYSTEM Hydration System Advisory please note that the integrated bottle can only be assembled on the Triathlon riser stem 301B The TT flat stem 301A is compatible with a horizontal to...

Page 13: ...ty is solely granted in case of purchase of a completely assembled bike to the explicit exclusion of purchases of not completely assembled bikes In case of a warranty claim the decision to repair or t...

Reviews: