![Scion PT398-52122 Manual Download Page 17](http://html1.mh-extra.com/html/scion/pt398-52122/pt398-52122_manual_1217794017.webp)
SCION
xD
2012 -
TVIP V5
Procedure
SCION SECURITY
Page 17 of 23 pages
Issue: A 10/18/11
9. Secure the V5 GBS ECU to the
reinforcement brace lightly as shown
with the Butyl Tape on the GBS ECU.
10. Secure the V5 GBS ECU to the
Reinforcement using 4 Wire Ties (2
sets of 2) placed in an X pattern.
11. Insert V5 8 Pin Connector into the
GBS ECU.
12. Bundle up the excess V5 Harness
and secure it to the Vehicle Brace
with 2 Wire Ties.
13. Apply 2 large Foam Tapes to the GBS
ECU and Wire Ties after trimming the
Wire Ties.
Fig.D-7
Fig.D-6
Wire Ties (x2)
Wire Ties (x4)
Side Cutter