![Scion PT398-52122 Manual Download Page 12](http://html1.mh-extra.com/html/scion/pt398-52122/pt398-52122_manual_1217794012.webp)
SCION
xD
2012 -
TVIP V5
Procedure
SCION SECURITY
Page 12 of 23 pages
Issue: A 10/18/11
16. Unplug the vehicle 14 Pin connector
on the Junction box.
17. Proceed with “Wire to Wire”.
Insert V5 14 Pin Connectors in
between vehicle 14 Pin connectors.
18. Secure the 6 Pin and 14 Pin
Connectors with 2 Wire Ties.
19. Secure the Relay with 1 Wire Tie.
Ensure that the Relay does not
contact any metal surface.
Move onto step 27.
20. Clip the Wire Ties holding bundled up
V4 6 Pin Connector.
Fig.B-15
Side Cutter
V5 onto V4
-
Add On installation
Fig.B-13
Fig.B-14
Side Cutter