![Scion PT398-52122 Manual Download Page 15](http://html1.mh-extra.com/html/scion/pt398-52122/pt398-52122_manual_1217794015.webp)
SCION
xD
2012 -
TVIP V5
Procedure
SCION SECURITY
Page 15 of 23 pages
Issue: A 10/18/11
2. Fold 1 Butyl Tape as shown and
apply it to the GBS ECU.
3. Apply 1 Butyl Tape to the ECU as
shown.
D. Wire Harness Installation
(Passenger’s side)
1. Secure V5 Harness to the
reinforcement with 1 Wire Tie.
2. Insert V5 36 Pin Connector into V5
Security ECU.
3. Put 3 pieces of Butyl Tape on the
Reinforcement as shown.
4. Put 3 more pieces of Butyl Tape on
top of the previously applied Butyl
Tape.
Fig.D-1
Side Cutter
1 Wire Tie
Fig.D-2
Butyl Tape
x6
Fig.C-2
GBS ECU
Butyl Tape