background image

 

 

Rotary Evaporator

 

Lift-down key

Int key

Lift-up key

Timer key

Control knob

Temperature key

Speed key

LED power

LCD display

 

Figure 3 

 

Figure 4 

 

Items 

Descriptions 

Speed key 

Speed

 

Push the key and then rotate control knob 

to set the rated speed in the range from 20 

to 280. 

Temperature 

key 

Temp

 

Push the key and then rotate control knob 

to  set  the  rated  temperature  in  the  range 

from room temperature to 180°C

water: 

RT~90

℃)

,

 

press the key for 3s to switch 

the heating mode. 

Timer key 

Timer

 

Push the key and then rotate control knob 

to  set  the  rated  time  in  the  range  from  1 

to 999min. 

Int key 

Int

 

Push the key and then rotate control knob 

to set the interval for right-left running in 

the range from 1 to 999s. 

Control knob 

Clockwise  rotate  to  increase  program 

values. Rotate anti-clockwise to decrease 

program values. 

Press the knob, switch ON/OFF the unit. 

Lift-up key 

Press the key, the lift goes up. Release the 

key  the  lift  stops  and  remains  in  that 

position. 

Lift-down key 

Press the key, the lift goes down. Release 

Power switch 

Summary of Contents for SCI100-Pro

Page 1: ...rator User Manual LCD Digital Rotary Evaporator Please read the User Manual carefully before use and follow all operating and safety instructions Technical specifications and outline are subject to ch...

Page 2: ...ion 6 3 1 Receiving Inspection 6 3 2 Listing of Items 6 4 Control and Display 6 4 1 Control elements 6 4 2 Display 8 5 Installation and Operation 9 5 1 Installation 9 5 2 Operation 13 6 Faults 14 7 Ma...

Page 3: ...or software Methods and procedures adopted to resolve the problems Your contact information Warranty This instrument is warranted to be free from defects in materials and workmanship under normal use...

Page 4: ...materials can be hazardous to user Set up the device in a spacious area on an even stable clean non slip dry and fireproof surface Ensure that there is sufficient space above the device as the glass a...

Page 5: ...r a compa rable protective device Adapt the quantity and the type of distilland to the size of the distillation equipment The cooler must work properly Monitor the coolant flow rate at the cooler outl...

Page 6: ...ust gases indicate that flask content is beginning to decompose Switch off heating immediately Use the lifting mechanism to lift the evaporator piston out of the heating bath Evacuate the danger zone...

Page 7: ...rotect the appliance and accessories from bumps and impacts The appliance may only be opened by experts 2 Proper Use The instrument is designed for distilling in schools laboratories or factories Toge...

Page 8: ...damage to the system please do not plug it into the power line 2 Loosen transportation lock before Power ON 3 2 Listing of Items The package includes the following items Items Qty Main unit 1 Heating...

Page 9: ...ater RT 90 press the key for 3s to switch the heating mode Timer key Timer Push the key and then rotate control knob to set the rated time in the range from 1 to 999min Int key Int Push the key and th...

Page 10: ...rotating function is switched ON Temp Display when the heating function is switched ON Timer Display when timer function is switched ON Int Display when Int function is switched ON Speed display area...

Page 11: ...heating mode to oil press the temperature key for 3s the temperature display OIL Figure 6 Figure 6 When select the oil mode the temperature display as Figure 7 Figure 7 The same way press the temperat...

Page 12: ...nd position The distance is 150mm Connect the device to the power supply using power cable b Connect the heating bath to the device c Figure 7 Remove the clamping device for the angle setting of the r...

Page 13: ...it clockwise by 60 The plastic screw nut f helps loosen tight fitting piston ground in connections Figure 9 Hold the tight fitting evaporator piston and counter clockwise e and then turn the plastic s...

Page 14: ...locking spring i to condenser in turn Tighten the cap nut hand screwed h Start the device at 200 rpm for 2 min Then tighten the cap nut firmly Figure 12 Figure 13 Installing the vertical glassware co...

Page 15: ...15 Figure 15 5 2 Operation Make sure the required operating voltage and power supply voltage match Ensure the socket must be properly grounded Plug in the power cable ensure the power is on and begin...

Page 16: ...0 Press the control knob switch ON If these operations above are normal the device is ready to operate If not the device may be damaged during transportation please contact manufacturer supplier for...

Page 17: ...de Before using other method for cleaning or decontamination the user must ascertain with the manufacturer that this method will not harm the instrument Wear the proper protective gloves during cleani...

Page 18: ...igital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment Th...

Page 19: ...tion Yes Temperature Range C RT 180 Heat Control Accuracy C 1 Temperature Display LCD Heat Output W 1300 Lift Motor Stroke mm 150 Timer min 1 999 Overall Dimensions D W H mm 465 457 583 Weight kg 15 P...

Page 20: ...SCILOGEX LLC 1275 Cromwell Ave Suite C6 Rocky Hill CT 06067 USA Tel 1 860 436 9221 Fax 1 860 436 9745 info scilogex com www scilogex com...

Reviews: