
Unpack and Place the System
Refer to the “Checklists” in the
Site Planning Guide
for more information.
Unpack the System
WARNING! Lifting Hazard. Make sure that at least three people or a lifting device
are available to lift the CE system. Follow established safe lifting procedures. Refer
to the Site Planning Guide for the weights of system components.
WARNING! Electrical Shock Hazard. Make sure that the system can be
disconnected from the mains supply outlet in an emergency. Do not block
the mains supply outlet.
1. Inspect the shipping box for damage or evidence of mishandling. If external damage is evident, notify the
carrier before opening the crate.
2. Cut the straps on the box and then open the box.
3. Remove the cartridge stand and the ship kit containing cables from the packaging foam.
4. Remove the boxes containing the controller and monitor.
5. (For customers with the cart) Remove the cart from the box and then lock the wheels on the cart.
6. Lift the C100
HT
Biologics Analyzer system out of the box and then put it on the bench or the cart.
7. Instruct the user to store the packaging in a safe location for later use when moving the system.
Unpack the Controller and Monitor
1. Open the controller carton, remove the controller, and then put it on the cart or a table close to the C100
HT
Biologics Analyzer system.
2. Open the monitor carton, remove the monitor, and then put it on the cart or the table close to the controller.
3. Instruct the user to store the packaging in a safe location for later use when moving the system.
Installation Guide
C100
HT
Biologics Analyzer System
RUO-IDV-09-3829-A
10 / 31
2
Installation Instructions