Appendix
Operation Manual - SP 305
98
revDate
Nomograph SP 305
P 3
0
5
P
in PSI
Q in yd
3
/hr.
600
400
200
30
60
20
40
1000
800
625
Technical identification number (TK)
Metric to English Conversion factor is TK x 18.966
Power:
Model:
By:
Number:
Max Q
Revision date:
Power:
Model:
Number:
Max Q
Revision date:
P
305
30 Kw
36 Kw
054
RE
071305
102 l/m
2.5/1.75 x 30:5
Pumpkit Model:
P 305
3 0 K w
3 6 K w
0 5 4
0 7 1 3 0 5
102 l/m
Pipeline diameter in inches
Proportional value of pipeline in feet
For vertical placing,
add 1.105 PSI per foot
of level dif
ference.
Slump of fresh concrete in inches
30 Kw 36 Kw
100
2000
200
300
400
500
600
800
1000
1200
1500
1800
2500
3000
2"
2.5"
3"
4"
5"
6"
6"
5"
4.5"
4"
3" *
2" *
*estimate
TK 750
(14225)
TK 900
(17069)
Revision: 071305, add 36Kw
, RE
Home
TOC
Home
TOC
Summary of Contents for SP 305
Page 10: ...Introduction Operation Manual SP 305 10 8 4 11 NOTES Home TOC Home TOC Print Print...
Page 14: ...Specifications Operation Manual SP 305 14 8 4 11 NOTES Home TOC Home TOC Print Print...
Page 20: ...Safety Operation Manual SP 305 20 8 4 11 NOTES Home TOC Home TOC Print Print...
Page 38: ...Operation 38 8 4 11 Operation Manual SP 305 Home TOC Home TOC Print Print...
Page 100: ...Appendix Operation Manual SP 305 100 revDate NOTES Home TOC Home TOC Print Print...
Page 101: ...SP 305 OPERATION MANUAL INDEX Home TOC Home TOC Print Print...