10
STR-JZ I&O Manual
IM090831
RD: AUG 2009
RL: 09A- BA
WARNING
Improper installation, adjustment, alteration, service or maintenance can cause
property damage, injury or death. Read and understand this installation and
operation manual thoroughly prior to assembly, installation, operation or service to
this appliance.
This heater must be installed and serviced only by a trained gas service technician.
Do not store or use gasoline or other flammable vapours and liquids in the vicinity
of this or any other gas fired appliance.
Failure to comply could result in personal injury, death, fire and/or property damage.
Do not store or use gasoline or other flammable vapours and liquids in the vicinity
of this or any other gas fired appliance.
5.
PRE INSTALLATION SURVEY
It is recommended that a full heating design including heat loss calculation be conducted on
the structure or area to be heated. Heater sizing and placement must consider available
mounting height, sources of greatest heat loss, and the certified clearances to combustibles
with respect to stored material, moveable objects (cranes, vehicles, lifts, overhead doors, etc),
sprinkler system heads, and other obstructions on the site. Consideration must also be given to
vent / duct placement and the allowable combined lengths of vent and duct. Carefully survey
the area to be heated, and for best results place burner and combustion chamber in the coldest
area(s) .
Installation must conform with all local, state, provincial and national code requirements includ-
ing the current latest edition ANSI Z223.1 (NFPA 54) in the U.S.A. and B149.1 installation
code in Canada, for gas burning appliances and equipment. The latest edition Electrical Code
ANSI/NFPA N0 70 in the U.S.A. and PART 1 CSA C22.1 in Canada must also be observed.
The heating system must have gas piping of the correct diameter, length, and arrangement to
function properly. For this reason, a layout drawing is necessary.