![SCHUNK VERO-S NSE plus 100-75 Translation Of Original Operating Manual Download Page 54](http://html1.mh-extra.com/html/schunk/vero-s-nse-plus-100-75/vero-s-nse-plus-100-75_translation-of-original-operating-manual_1215836054.webp)
Operation
54
04.00|NSE plus, NSL plus, NSD plus |en
Operation
NOTICE
When changing the pallet using lifting equipment or a robot,
ensure that the pallet is lifted exactly parallel to the modules.
The inclination (X) during lifting may not exceed 1.2°.
If the inclination is larger, the clamping pins can jam and the
system components could be damaged or destroyed. In this
case, the system must be inspected and damaged parts must be
replaced immediately.
Only original SCHUNK spare parts may be used!
WARNING
Risk of injury due to losing pallets or workpieces in the case of
incorrect actuation caused by incorrect operation.
Risk of injury due to compressed air hoses coming loose when
connected improperly.
• Disconnect the energy supply after locking.
• Use check valves or safety switches.
• The danger zone must be surrounded by a protective enclo-
sure during operation.
WARNING
Risk of injury due to losing pallets or workpieces if the supply of
compressed air drops or fails, and due to the clamping pins im-
mediately closing
• Do not reach into the clamping module.
• Use pressure maintenance valves.
• Use loading devices.
5
Summary of Contents for VERO-S NSE plus 100-75
Page 32: ...Assembly 32 04 00 NSE plus NSL plus NSD plus en NSE plus 100 75 4 3 10 ...
Page 41: ...Assembly 04 00 NSE plus NSL plus NSD plus en 41 NSL plus 400 ...
Page 43: ...Assembly 04 00 NSE plus NSL plus NSD plus en 43 NSL plus 600 ...
Page 45: ...Assembly 04 00 NSE plus NSL plus NSD plus en 45 NSL plus 800 ...
Page 64: ...Assembly Drawings 64 04 00 NSE plus NSL plus NSD plus en NSE plus V1 cylindrical version 9 2 ...
Page 65: ...Assembly Drawings 04 00 NSE plus NSL plus NSD plus en 65 NSE plus 100 75 9 3 ...