Assembly
03.00 | RSS R1/W1 | Assembly and Operating Manual | en | 0889125
19
4.3 Mount transmission module RSS-W1 on lathe chuck ROTA
TB/TB2/EP with fast stroke (LH)
The system is delivered fully assembled by SCHUNK. The following
assembly notes are only required during maintenance work.
■
Pressure monitoring kit MATCH-code "DRSS..." (stroke monitor-
ing RSS-W1 8705505) is available
Ø
Carefully press insert into the recess of the chuck.
Ø
NOTICE! Observe the specified tightening torque.
Secure insert with two allen screws (10).
Mounting material and tightening torque
Mounting
RSS-W1
Screw size
M5
Screw quality
10.9
Tightening torque [Nm]
7.5
4.4 Changing the battery
Original spare parts
Use only original spare parts of SCHUNK when replacing spare and
wear parts.
Batteries
Batteries are not included in the SCHUNK spare parts kit and must
be ordered separately
Position of the item numbers
■
Spare part kit with the MATCH-code "RSS…" (spare parts kit RSS-
W1 1150471) is available
■
All pressure chambers of the chuck are depressurized
Ø
Remove the screws (10).
Ø
Screw in screws of size M6 in the threaded holes of the screws
(10).
Ø
Pull out the insert (1) using the M6 screws and unscrew the M6
screws.
Ø
Remove the screws (15).
Ø
Remove disk (4) from the insert (1).
Ø
Remove the seal (23).
Ø
NOTICE! Pay attention to the correct polarity when inserting.
Change the battery.
Ø
Clean all parts and check for damage and wear. Replace dam-
aged and worn parts.
Ø
Insert seal (23).
Ø
Screw the disk (4) onto the insert (1) using the screws (15).
Ø
Screw the insert (1) onto the chuck using the screws (10).