Assembly
5.3 Air connection
CAUTION
Observe the requirements for the air supply
Pneumatic connections
1
Rotary feed-through input 1
2
Rotary feed-through input 2
3
Rotary feed-through output, radial hose connection 2
4
Rotary feed-through output, hose-free direct connection 2
5
Rotary feed-through output, hose-free direct connection 1
6
Rotary feed-through output, radial hose connection 1
• Connection via M7 connection (thread 6 deep).
• Only open the air connections required.
• For hose-free direct connections, use 8x 1 O-rings.
Dimensions for hose-free direct connection
61
05.00 | ERD | Assembly and operating manual | en | GAS 315325
Summary of Contents for ERD 04
Page 2: ...deutsch 3 english 41 2 05 00 ERD Montage und Betriebsanleitung de en GAS 315325...
Page 78: ......
Page 79: ......