OPERATION
GX-150 03/21
Operation Section 4-16
© 2021 Alamo Group Inc.
OPERA
TION
Engagement Check Procedure
•
With the driveline attached, position the mower to the point where the telescoping driveline is at its
maximum extension. Completely shut down the tractor and secure in position.
•
Mark the inner driveline shield 1/8” from the end of the outer shield.
•
Disconnect the driveline from the tractor and separate the two driveline halves.
•
Measure the distance from the mark to the end of the inner profile. This length is the amount the driveline
profiles were engaged.
•
If the engaged length is less than 6”, the shaft is considered too short and should be replaced with a longer
shaft. Consult an authorized dealer to purchase the required driveline length.
NOTE:
If the driveline cannot be shortened and still maintain the required profile engagement, the operator
must be made aware of terrain conditions and avoid situations which pose a potential problem to avoid
damaging the driveline or move drawbar to 16” or 20” position for required clearance.
Summary of Contents for GX-150
Page 2: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2021 Alamo Group Inc SAFETY SECTION ...
Page 27: ...SAFETY GX 150 03 21 Safety Section 1 17 2021 Alamo Group Inc SAFETY Decal Location ...
Page 29: ...SAFETY GX 150 03 21 Safety Section 1 19 2021 Alamo Group Inc SAFETY Decal Description ...
Page 30: ...SAFETY GX 150 03 21 Safety Section 1 20 2021 Alamo Group Inc SAFETY ...
Page 31: ...SAFETY GX 150 03 21 Safety Section 1 21 2021 Alamo Group Inc SAFETY ...
Page 32: ...SAFETY GX 150 03 21 Safety Section 1 22 2021 Alamo Group Inc SAFETY ...
Page 33: ...SAFETY GX 150 03 21 Safety Section 1 23 2021 Alamo Group Inc SAFETY ...
Page 34: ...SAFETY GX 150 03 21 Safety Section 1 24 2021 Alamo Group Inc SAFETY ...
Page 35: ...SAFETY GX 150 03 21 Safety Section 1 25 2021 Alamo Group Inc SAFETY ...
Page 36: ...SAFETY GX 150 03 21 Safety Section 1 26 2021 Alamo Group Inc SAFETY ...
Page 37: ...SAFETY GX 150 03 21 Safety Section 1 27 2021 Alamo Group Inc SAFETY ...
Page 38: ...SAFETY GX 150 03 21 Safety Section 1 28 2021 Alamo Group Inc SAFETY ...
Page 40: ......
Page 41: ...Introduction Section 2 1 2021 Alamo Group Inc INTRODUCTION SECTION ...
Page 47: ...Assembly Section 3 1 2021 Alamo Group Inc ASSEMBLY SECTION ...
Page 55: ...Operation Section 4 1 OPERATION SECTION ...
Page 108: ...OPERATION GX 150 03 21 Operation Section 4 54 2021 Alamo Group Inc OPERATION ...
Page 109: ...Maintenance Section 5 1 2021 Alamo Group Inc MAINTENANCE SECTION ...
Page 113: ...MAINTENANCE GX 150 03 21 Maintenance Section 5 5 2021 Alamo Group Inc MAINTENANCE ...
Page 129: ...MAINTENANCE GX 150 03 21 Maintenance Section 5 21 2021 Alamo Group Inc MAINTENANCE ...
Page 130: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 29 2021 Alamo Group Inc SEGURIDAD ...
Page 131: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 28 2021 Alamo Group Inc SEGURIDAD ...
Page 132: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 27 2021 Alamo Group Inc SEGURIDAD ...
Page 133: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 26 2021 Alamo Group Inc SEGURIDAD ...
Page 134: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 25 2021 Alamo Group Inc SEGURIDAD ...
Page 135: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 24 2021 Alamo Group Inc SEGURIDAD ...
Page 136: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 23 2021 Alamo Group Inc SEGURIDAD ...
Page 137: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 22 2021 Alamo Group Inc SEGURIDAD ...
Page 138: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 21 2021 Alamo Group Inc SEGURIDAD ...
Page 139: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 20 2021 Alamo Group Inc SEGURIDAD ...
Page 140: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 19 2021 Alamo Group Inc SEGURIDAD ...
Page 141: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 18 2021 Alamo Group Inc SEGURIDAD ...
Page 158: ...Sección de Seguridad 1 1 2021 Alamo Group Inc SECCIÓN DE SEGURIDAD ...
Page 159: ......