Installing a reed board
Installation of a new reed board is carried out in reverse
order.
•
Insert the two plug-type connectors and screw the
fastening screws in.
•
Secure the reed board inside the oblong holes of the
holder by means of the screws and the 8 mm nuts.
Adjusting the reed board
The reed board is installed into the oblong holes of the
holder. If the LEDs on the hand-held control unit show a
different function than the one preselected, the reed
board can be adjusted inside the oblong holes until the
LEDs show the correct function.
•
In order to adjust the reed board inside the oblong
holes, loosen the fastening screws and shift the reed
board in lateral direction until the LEDs show the
correct function.
•
Finally secure the reed board by means of the screws
and the 8 mm nuts.
h
If the selector lever with the permanent magnet
has been lifted off its seat after installation, the
reed board does not switch on. Make sure that
the selector lever is positioned correctly above
the reed board.
In case one or several of the LEDs do not light, the
distance between the permanent magnet and the magnet
switch can be diminished by turning the headless screw
in.
•
Turn the headless screw with the magnet in until all
magnetic switches are switched on. The LEDs at the
hand-held control unit will light one by one when the
selector lever for the hydraulic switch valve is moved.
Final tasks
•
Check the display of the hand-held control unit. If
required, adjust the reed board as described before.
•
Place the cladding back on top of the mobile base.
•
Re-attach the cladding panels at the height adjustment
column.
Reed board
Headless screw