For safe installation and trouble-free operation, please observe and comply with the follow-
ing points:
The ejector may only be operated using power supply units with protected
extra-low voltage (PELV). The system must incorporate safe electrical cut-
off of the power supply in compliance with EN60204.
Do not operate the ejector in environments where there is a risk of
explosion.
Risk of fire and explosion.
Output signals (discrete signals as well as IO-Link signals) can change
when the power supply is switched on or the M12 connectors are plugged
in. Depending on the function of the machine/system, this can result in
serious personal injury or damage to the equipment.
The device may not be operated outside its specified performance limits.
Doing so may cause it to malfunction or be destroyed.
During installation and maintenance, make sure that the ejector is disconnected
and depressurized and that it cannot be switched on again without authorization.
Personal injury or damage to the ejector may occur.
Protect the ejector from damage at all times.
No modifications may be made to the ejector.
Opening the ejector will damage the “tested” labels. This voids the warranty.
Connection symbols and labels are located on the ejector.
These must be observed.
Only the intended connections may be used.
Pneumatic and electrical line connections must be securely connected and attached to
the ejector.
The ejector may be installed in any position.
If these instructions are not observed, malfunctions, material damage and serious injury
– including fatal injury – may result.