![Schmalz SCPMc Series Short Instruction Manual Download Page 6](http://html1.mh-extra.com/html/schmalz/scpmc-series/scpmc-series_short-instruction-manual_1212882006.webp)
ü
Provide a connection cable with an M8 6-pole
socket (not included in delivery).
4
Attach the connection cable to the ejector, maxi-
mum tightening torque = hand-tight.
ü
Provide a connection cable with a 5-pole JST plug
(not included in delivery).
4
Attach the connection cable to the ejector.
8.1 Pin Assignments
M8 plug
Pin
Symbol
Wire color
1)
Function
1
US
Brown
24 V power supply
2
IN1
White
“Suction” signal input
3
GND
Blue
Ground
4
OUT
Black
“Parts control” output (SP2)
5
IN2
Gray
“Blow off” signal input
6
—
Pink
Not used
1)
When using a Schmalz connection cable, part no. 21.04.05.00488 (see accessories)
JST socket
Pin
Symbol
Function
1
US
24 V power supply
2
IN1
“Suction” signal input
3
GND
Ground
4
OUT
“Parts control” output (SP2)
5
IN2
“Blow off” signal input
9 General Preparations
WARNING
Extraction of hazardous media, liquids or bulk material
Personal injury or damage to property!
4
Do not extract harmful media such as dust, oil mists, vapors, aerosols etc.
4
Do not extract aggressive gases or media such as acids, acid fumes, bases, biocides, disinfectants
or detergents.
4
Do not extract liquids or bulk materials, e.g. granulates.
Always carry out the following tasks before activating the system:
1. Before each use, check that the safety devices are in perfect condition.
2. Check the ejector for visible damage and deal with any problems immediately (or notify your supervisor).
3. Ensure that only authorized personnel are present in the working area of the machine or system and that no
other personnel are put in danger by switching on the machine.
There must be no people in the system danger area while it is in operation.
6 / 6
EN-US · 30.30.01.02085 · 00 · 06/19