9. Servicing / Maintenance
196 | 268
Original Operating Manual | Edition 1.0 (01-2020) | CrimpCenter 64 SP
The duration and the interval of the maintenance of the maintenance sheets
up to
"9.5.11 Power Sockets (Page 223)"
are summarized in the mainte-
nance sheet
"9.5 Maintenance Sheet - Check Safety Devices (Page 197)"
.
Maintenance task
Page Duration
Interval
Check Security Elements
approx. 30 min.
Yearly
» Main Switch
-
-
» Emergency stop switch
-
-
» Confirm Button
-
-
» Safety Cover - Open/Close - Button
-
-
» Safety Cover - Safety Switch
-
-
» Safety Cover - Closing Force
-
-
» Safety Cover - Safety when Lowering
-
-
» Standstill Monitoring
-
-
» Pneumatic - Main Shut-Off Valve
-
-
» Conveyor belt
-
-
» Power Sockets
-
-
Check Machine
approx. 20 min.
Yearly
Surfaces - Cleaning and Care
approx. 30 min.
Weekly
Lubricate the Cutting Unit
approx. 5 min.
250.000 cycles
Clean Cutter Block
approx. 10 min.
Weekly
Cutter Block - Change Blades
approx. 20 min.
Individual
Wire Feeding Unit - Change Belts
approx. 5 min.
Individual
Pneumatic - Drain Condensate
approx 1 min.
Monthly
Pneumatics - Clean / Replace Filter
approx. 5 min.
Yearly
Control Cabinet - Clean / Replace Filter
approx. 10 min.
Weekly
Check conveyor belt
approx. 5 min.
Weekly