PROLINE ROOF HOOKS | V2 | INSTALLATION GUIDE | 202102
4
SCHLETTER SOLAR GMBH | SUBJECT TO CHANGES
INSTALLATION
1. SELECT POSITION
n
Select mounting position along
the existing rafters.
n
Cover the roof tiles.
For low roof pitches and unusual tile shapes,
we recommend applying our “sealing tape for
roof tiles” before inserting the roof hook.
Use a spacer if necessary.
A minimum distance of 5 mm must be
maintained between the bracket of the roof
hook and the roof tile underneath it. When
ordering the roof hook, make sure that the
height of the lower bracket section has been
chosen correctly in relation to the batten
height and the tile thickness and that the
minimum distance can be maintained.
When carrying out the following step, observe the recognised rules of the roofing trade as a
matter of priority. The machining of roof tiles regularly leads to the loss of the warranty and, if
applicable, a guarantee for the roof cladding. Improper machining of roof tiles can cause the
roof to leak and result in significant damage.