background image

Clean out to grade

on inlet pipe (by others)

Clean out to grade

on outlet pipe (by others)

Flow

Flow

Risers to grade

(;&$9$7,21$1'%$&.),//'(7$,/

,17(5,2525(;7(5,25

2-Way cleanout

tee (by others)

2-Way cleanout

tee (by others)

6,'(9,(:'(7$,/

Optional Anchor kit

see detail

Optional Anchor kit

see detail

Concrete slab

Native soil

Crushed aggregate

or sand

Optional Anchor kit

see detail

the unit footprint

Concrete Pad 

must extend 

18" outside 

ƒ

2 1/2" Min.

18" outside the unit footprint

Concrete Pad must extend 

8"

4"

Rebar

Finished Grade

Rebar

PS-275-B 

Shown

&21&5(7(6/$%'(7$,/)2575$)),&/2$',1*

,17(5,2525(;7(5,25

36%6KRZQ

Top View

Elevation View

Stainless steel

anchor strap

Stainless steel

Anchor plate

Stainless hardware

$1&+25.,7,167$//$7,21'(7$,/

$QFKRU.LW,QVWDOODWLRQ6WHSV

Slide "Anchor Strap" over tie down point on end wall and

1.

bolt together using provided hardware.

Bolt "Anchor Strap" to "Anchor Plate" using provided hardware

2.

3.   Hold down force achieved by backfill weight acting on Anchor Plate.

4.   Anchor Plate may be bolted to concrete slab, if required, by using

holes provided in Anchor Plate.

)RUXQLWGHWDLOVVHHVSHFLILFDWLRQVKHHWIRUVHOHFWHGXQLW

&RQQHFWLQJSLSHDQGILWWLQJVE\RWKHUV

127(6

   

Schier solids interceptors are not to be installed in any other manner except as shown.  Consult local 

codes for separate trapping requirements, cleanout locations and additional installation instructions.

,17(5,2525(;7(5,25%(/2:*5$'(,167$//$7,21,16758&7,216

36%636%636%636%6

&211(&7,216

Connect waste piping to the unit. 

1.

Handle of removable basket or screen bay be extended using 1-1/2" PCV pipe, if necessary.

2.

%(/2:*5$'(,167$//$7,21,16758&7,216

(;&$9$7,21

Install unit(s) as close as possible to fixtures being serviced.

1.

Width and length of excavation shall be minimum 12" greater 

2.

than the tank on all sides.

Depth of excavation shall be 6" deeper than tank bottom.

3.

Set the tank in well-packed crushed aggregate material 

4.

approximately 3/4" size rock, or sand, with no fines.  

Anchor kit is recommended for installations in high water table conditions to 

5.

prevent float out. To be determined by specifying engineer.  If necessary, 

order optional "Anchor Kit" (see detail right).

%$&.),//,1* ),1,6+('&21&5(7(6/$%

Preparation of sub grade per geotech recommendations.

1.

Stabilize and compact sub grade to 95% proctor.

2.

Fill tank with water before backfilling to prevent float out during piping installation.

3.

Before backfilling and pouring of slab secure cover(s) and riser/s (if necessary) to the unit(s) 

4.

Backfill using crushed aggregate material approximately 3/4" size rock, or sand, 

5.

with no fines.

6.   Place 6" aggregate base under slab. Aggregate should be 3/4" size rock, or sand, with no fines.

7.   Thickness of concrete around cover to be determined by specifying engineer.  If traffic

loading is required the concrete slab dimensions shown are for guideline

purposes only.  

8.   Concrete to be 28 day compressive strength to 4000 PSI.

9.   NO. 4 rebar (  1/2") grade 60 steel per ASTM A615: connected with tie wire.

10. Rebar to be 2 1/2" from edge of concrete.

11. Rebar spacing 12" grid. 4" spacing around access openings.

12. All pipe penetrations to be sleeved or have slip connections.

'$7(

11/30/11

PS SERIES INSTALLATION, OPERATION 

AND MAINTENANCE GUIDE

6FKLHU3URGXFWV

:RRGHQG5G

(GZDUGVYLOOH.6

7HO

)D[

ZZZVFKLHUSURGXFWVFRP

0DGHLQWKH86$

'(6&5,37,21

':*%<

EAS

5(9

01

'2&80(17180%(5

057-0650-01

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF 

6&+,(5352'8&76

. ANY REPRODUCTION IN 

PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF 

6&+,(5352'8&76

IS PROHIBITED.

35235,(7$5<$1'&21),'(17,$/

6+((7180%(5

3 of 6

(&2

1003

Summary of Contents for PROSPECTOR Series

Page 1: ...eplace or supply credit to the original purchaser This warranty does not cover damage caused by the Products normal usage or wear and tear nor does it cover damage from naturally occurring phenomenon including but not limited to UV freeze related damage or natural disasters This warranty does not cover the purchaser s cost of routine maintenance including replacement of parts required in routine m...

Page 2: ...aced 4 Clean main body of the interceptor Make sure to remove water and fine debris that may have accumulated 5 Replace basket or screen in proper locations 6 Fill unit with water 7 Replace cover s Inspect gasket on underside of cover for wear and tear 8 Properly dispose of collected material 3803 1 5 48 1 Frequency depends on the capacity of the separator and the amount of debris in the wastewate...

Page 3: ...ced 1 Width and length of excavation shall be minimum 12 greater 2 than the tank on all sides Depth of excavation shall be 6 deeper than tank bottom 3 Set the tank in well packed crushed aggregate material 4 approximately 3 4 size rock or sand with no fines Anchor kit is recommended for installations in high water table conditions to 5 prevent float out To be determined by specifying engineer If n...

Page 4: ...7 backfill material approximately 3 4 size rock or sand 2 with no fines 3 Place 6 aggregate base under slab 211 7 216 Connect waste piping to the unit 1 17 5 25 29 5 167 7 21 16758 7 216 36 6 5 6 If concrete slab falls within body of unit reinforce with rebar extending 6 beyond footprint of unit to connect main floor slab When the jobsite requires burying unit flush with floor without using a rise...

Page 5: ...ve been DO NOT cut this new line Once the riser is installed into the main unit this new line will end up at the top of the gasket and will aid in re assembly See Figure 3 IMPORTANT Before the next step 8 Make sure both diffusers are installed inside the main unit at the appropriate locations 1 and check if there needs to be any flow control adjustment on the inlet diffuser Refer to sheet 2 of the...

Page 6: ...ntil it stops about 1 inch See Figure 2 4 Measure the distance from the top edge of the riser down to the finished floor Make sure to account for any future tile work 5 in your measurment See Figure 2 Remove riser from ring Take measurement from step 5 from the BOTTOM of the riser upwards towards the top of the 6 riser Mark a line around the riser and cut with handsaw jig saw or reciprocating saw ...