
Connect inlet and outlet drainage lines to
unit. Mechanically couple pipes to
unit.
'RQRWVROYHQWZHOG
.
Top View
Top View
(Inside Unit)
FLOW
Flow
Fill with water
PS-275-B Shown
PS-275-B Shown
Removable filter
basket
Outlet
Inlet
FLOW
Isometric View
Set unit on level solid surface as close as
possible to fixtures being served. If unit is
to be installed below grade refer to below
grade installation instructions. (sheet #3)
127(6
Schier solids interceptors are not to be installed in any other manner except as shown. Consult local
codes for separate trapping requirements, cleanout locations and additional installation instructions.
23(5$7,21
The prospector Series (PS-Series) solids interceptors are designed to capture
heavy and suspended solids from in-line drainage applications before entering
the public sewer or private septic system. This is done by means of a removable
perforated basket or a removable perforated screen.
0$,17(1$1&(
Remove cover(s).
1.
Remove basket (for "-B" models) and empty contents into receptacle.
2.
Remove screen (for "-S" models) and discard any material captured by the
3.
screen. Note the placement of filters so they will be properly replaced.
4. Clean main body of the interceptor. Make sure to remove water and fine
debris that may have accumulated.
5. Replace basket or screen in proper locations.
6. Fill unit with water.
7. Replace cover(s). Inspect gasket on underside of cover for wear and tear.
8. Properly dispose of collected material.
3803,1*)5(48(1&<
Frequency depends on the capacity of the separator and the amount of debris
in the wastewater.
After initial installation, it is recommended that the basket or screen is inspected
every 3 to 4 weeks. A proper maintenance schedule can be determined based off
inspections.
7528%/(6+227,1*7,36
Slower than usual drainage may indicate the need to clean solids interceptor.
Always take proper care to ensure a safe and healthy environment while
cleaning interceptor. For best cleaning and maintenance service, call your
local sewer and drain contractor.
*(1(5$/,17(5&(3725,167$//$7,21,16758&7,216
36%6+2:1
To test unit and TeleGlide riser system for leaks, cap/plug unused connections and
fill unit with water to covers. Inspect gaskets, fittings, and unit for any leaks.
If no leaks are detected drain water to the static waterline. Unit is now ready to be
backfilled and put into operation.
'$7(
11/30/11
5(9
01
PS SERIES INSTALLATION, OPERATION
AND MAINTENANCE GUIDE
6FKLHU3URGXFWV
:RRGHQG5G
(GZDUGVYLOOH.6
7HO
)D[
ZZZVFKLHUSURGXFWVFRP
0DGHLQWKH86$
'(6&5,37,21
':*%<
EAS
6+((7180%(5
2 of 6
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF
6&+,(5352'8&76
. ANY REPRODUCTION IN
PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF
6&+,(5352'8&76
IS PROHIBITED.
35235,(7$5<$1'&21),'(17,$/
(&2
1003
'2&80(17180%(5
057-0650-01