Clean out to grade

on inlet pipe of each 

unit (by others)

Clean out to grade

on outlet pipe of each 

unit (by others)

Flow

Flow

Risers to grade

EXCAVATION AND BACKFILL DETAIL

(INTERIOR OR EXTERIOR)

2-Way cleanout

tee (by others)

2-Way cleanout

tee (by others)

SIDE VIEW DETAIL

Optional Anchor kit

see detail

Optional Anchor kit

see detail

Concrete slab

Native soil

Crushed aggregate

or sand

Optional Anchor kit

see detail

30"

60"

4"

the unit footprint

Concrete Pad 

must extend 

18" outside 

45.00°

2 1/2" Min.

18" outside the unit footprint

Concrete Pad must extend 

8"

4"

Rebar

Finished Grade

Rebar

GB-250 

Shown

CONCRETE SLAB DETAIL FOR TRAFFIC LOADING

(INTERIOR OR EXTERIOR)

(GB-250 Shown)

Top View

Elevation View

Stainless steel

anchor strap

Stainless steel

Anchor plate

Stainless hardware

ANCHOR KIT INSTALLATION DETAIL

Anchor Kit Installation Steps

Slide "Anchor Strap" over tie down point on end wall and

1.

bolt together using provided hardware.

Bolt "Anchor Strap" to "Anchor Plate" using provided hardware

2.

Hold down force achieved by backfill weight acting on Anchor Plate.

3.

4.   Anchor Plate may be bolted to concrete slab, if required, by using

holes provided in Anchor Plate.

For unit details see specification sheet for selected unit

(Connecting pipe and fittings by others)

NOTES:

Schier grease interceptors are rated and manufactured with an internal flow control system already in 

place.  They do not require an external flow control system or air intake vent.

   

Schier grease interceptors are not to be installed in any other manner except as shown.  Consult local 

codes for separate trapping requirements, cleanout locations and additional installation instructions.

INTERIOR OR EXTERIOR BELOW GRADE INSTALLATION INSTRUCTIONS

(GB-35 (INTERIOR ONLY), GB-50, GB-75, GB-125, GB-250)

CONNECTIONS

Connect waste piping to the unit.  When connecting GB-75 (2), GB-250 (2), GB-250 (3) and

1.

GB-250 (4) see sheet #5 for multiple unit installation instructions.

BELOW GRADE INSTALLATION INSTRUCTIONS

  

EXCAVATION

Install unit(s) as close as possible to fixtures being serviced.

1.

Width and length of excavation shall be minimum 12" greater 

2.

than the tank on all sides.

Depth of excavation shall be 6" deeper than tank bottom.

3.

Set the tank in well-packed crushed aggregate material 

4.

approximately 3/4" size rock, or sand, with no fines.  When setting GB-75 (2), 

GB-250 (2), GB-250 (3)and GB-250 (4) all units must be level. 

Anchor kit is recommended for installations in high water table conditions to 

5.

prevent float out. To be determined by specifying engineer.  If necessary, 

order optional "Anchor Kit" (see detail right).

BACKFILLING & FINISHED CONCRETE SLAB

Preparation of sub grade per geotech recommendations.

1.

Stabilize and compact sub grade to 95% proctor.

2.

Fill tank with water before backfilling to prevent float out during piping installation.

3.

Before backfilling and pouring of slab secure cover(s) and riser/s (if necessary) to the unit(s) 

4.

Backfill using crushed aggregate material approximately 3/4" size rock, or sand, 

5.

with no fines.

6.   Place 6" aggregate base under slab. Aggregate should be 3/4" size rock, or sand, with no fines.

7.   Thickness of concrete around cover to be determined by specifying engineer.  If traffic

loading is required the concrete slab dimensions shown are for guideline

purposes only.  

8.   Concrete to be 28 day compressive strength to 4000 PSI.

9.   NO. 4 rebar (  1/2") grade 60 steel per ASTM A615: connected with tie wire.

10. Rebar to be 2 1/2" from edge of concrete.

11. Rebar spacing 12" grid. 4" spacing around access openings.

12. All pipe penetrations to be sleeved or have slip connections.

DATE: 

11/1/10

GREAT BASIN INSTALLATION, OPERATION 

AND MAINTENANCE GUIDE

Schier Products

9500 Woodend Rd

Edwardsville, KS 66111

Tel: 800-827-7119

Fax: 800-827-9664

www.schierproducts.com

Made in the U.S.A

DESCRIPTION:  

DWG BY: 

TEU

REV: 

3 - 11/07/11

SHEET NUMBER: 

3 of 7

MATL: 

PE

 

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF 

SCHIER PRODUCTS

. ANY REPRODUCTION IN 

PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF 

SCHIER PRODUCTS 

IS PROHIBITED.

PROPRIETARY AND CONFIDENTIAL

Summary of Contents for GB-15

Page 1: ...oducts were originally installed and will at its option agree to repair replace or supply credit to the original purchaser This warranty does not cover damage caused by the Products normal usage or wear and tear nor does it cover damage from naturally occurring phenomenon including but not limited to UV freeze related damage or natural disasters This warranty does not cover the purchaser s cost of...

Page 2: ...y hand loosening green locking collars b 6 connections Remove threaded clean out plug from the back of the inlet and outlet diffusers Clean the drain lines diffusers and air relief thoroughly of all debris before replacing diffusers to 4 original positions or reinstalling threaded clean out plug Run sinks to fill unit s with water 5 Inspect gasket for wear and tear Replace cover s 6 Dispose of gre...

Page 3: ...ons BELOW GRADE INSTALLATION INSTRUCTIONS EXCAVATION Install unit s as close as possible to fixtures being serviced 1 Width and length of excavation shall be minimum 12 greater 2 than the tank on all sides Depth of excavation shall be 6 deeper than tank bottom 3 Set the tank in well packed crushed aggregate material 4 approximately 3 4 size rock or sand with no fines When setting GB 75 2 GB 250 2 ...

Page 4: ...FILLING FINISHED CONCRETE SLAB Before backfilling and pouring of slab secure cover s to the unit s 1 Backfill using crushed aggregate material approximately 3 4 size rock or sand 2 with no fines 3 Place 6 aggregate base under slab INTERIOR ABOVE GRADE INSTALLATION INSTRUCTIONS GB 15 GB 20 GB 25 If concrete slab falls within body of unit reinforce with rebar extending 6 beyond footprint of unit to ...

Page 5: ...s follow installation instructions outlined in installation packet Units must be piped as shown above to ensure that the units work properly as the system is designed The units must be equally spaced to ensure the equal distribution of effluent flow For systems that are installed below grade it is recommended to install a two way clean out tee extended to finished grade before and after each unit ...

Page 6: ...led into the main unit this new line will end up at the top of the gasket and will aid in re assembly See Figure 3 IMPORTANT Before the next step 8 Make sure both diffusers are installed inside the main unit at the appropriate locations 1 and check if there needs to be any flow control adjustment on the inlet diffuser Refer to sheet 2 of the installation instructions for flow control adjustment Re...

Page 7: ...p edge of the riser down to the finished floor Make sure to account for any future tile work 5 in your measurment See Figure 2 Remove riser from ring Take measurement from step 5 from the BOTTOM of the riser upwards towards the top of the 6 riser Mark a line around the riser and cut with handsaw jig saw or reciprocating saw Remove debris from cut edge with scraper utility knife or gloves See Figur...