9
Assembly
Step 1 Fit the back plate and side
plates.
Step 2 Fit log retainer, base panels
and grill.
Step 3 Fit vermiculite baffle plate.
Step 4 Fit the door.
The octagonal pumice starter
flue block fits inside the octagonal
stainless steel adaptor.
Make sure the socket is uppermost.
The Octagonal stainless steel
adaptor slides down inside
the stainless steel pipe shown
previously. The bottom of the
Octagonal adaptor lies flush onto
the Pumice top plate.
The first outer chimney block is
glued into place, making sure it’s
square and level.
Continue adding inner flue blocks
and outer casing using lip glue on
each joint on both inner and outer
blocks.
20
19
21
23
To finish off add render with
reinforcement mesh being used up
to ground floor ceiling.
Apply a thin layer of render and
press mesh into the render.
24
4x steel spacers push fitted around
inner flue block every 1m of
chimney.
22