6
Assembly
Measure and note the desired
location of ISOKERN CELSIUS
solution. Apply Schiedel ISOKERN
chimney glue to the pre-prepared
load bearing reinforced concrete
slab and place first pumice block.
Use a spirit level to ensure that the
block is positioned correctly, then
the whole installation remains in
level throughout its length.
Apply glue to the whole surface of
the block before placing the stove
recess baseplate.
Always wipe off excess glue and
check the level regularly with a
spirit level.
Apply glue to the whole top
surface of the module before
placing the the next block.
Wipe away any excess glue.
Apply glue all around the edge,
with the exception of the front
edge where the appliance will be
fitted.
Place first stove recess block.
Apply glue to the module outer
edge, with the exception of the gap
for the first ventilation grill.
The grill should be fitted once the
blocks have been rendered.
Repeat this process again for each
of the 7 U shaped stove recess
blocks.
There are 7 layers to fit in the
opening for the insert.
1
4
2
5
3
6