WALL GUIDE (WG) 
 

The Wall Guide is used to protect the vertical vent from lateral 
wind loads and to allow for thermal expansions.  When 
assembled, the proper installation location is near a joint but 
below the outer band.  The outer wall of the vent must be able 
to move away from the outer ring of the wall guide.  When 
properly attached to a combustible wall, the Wall Guide will 
maintain the proper clearances to combustibles. 

 

Wall Guides should be equally spaced along the wall at 

spacing no greater than 16’ for 5” through 10” diameters 

and 24’ for 12” through 48” diameters. 

 

 

 
 
 
 
 
 
 
 

 

Figure 24 – Wall Guide 

 

CAUTION: Always maintain proper clearances to combustibles 
when installing all guides and supports. Keep all insulation 
away from required clearance (air) spaces surrounding the 
vent. Guides and supports are only suitable for attachment to 
non‐combustible construction due to possible heat 
conduction.

 

 

FLOOR/ROOF GUIDE (FRG) 
 

Floor Roof Guides are used to provide lateral support for the 
vent in the roof and floor opening.  The Floor Roof Guide is to 
be bolted to non‐combustible construction in (4) four places. 
 
 
 
 
 
 
 
 
 
 

Figure 25 – Floor/Roof Guide 

 

SUPPORT PLATE (SP)

 

 

The Support Plate offers the greatest strength for support of 
the eVent Series Venting System.  It will provide vertical 
support and will provide for joint alignment and support for 
horizontal applications. Locate and secure the Support Plate as 
necessary by means of structural ties to the building. 

The Support Plate must be secured to structural members of 
the building, which can adequately support the weight of the 
vent as shown on this page of these instructions. 
 
 
 
 
 
 
 

 

 
 
 
 

 

 

Figure 26 – Support Plate Attachment 

 

The Support Plate consists of (4) split plate halves and 
necessary hardware.  The assembly is used to clamp the 
inner vee band at a joint connection, and are turned 90 
degrees a part as shown in figure 27 below.  The notches in 
the split plates are to accommodate the inner band end 
clips, allowing the "V" to rest solidly on the split plate.  The 
installation procedure is as follows: 
 

1.

 

Connect the inner joint to be supported by use of 
the inner band as previously discussed. 

2.

 

Connect the upper split support plate halves to the 
lower split support plate halves with the provided 
hardware. The split plate halves should be oriented 
90° as shown below.   

3.

 

3/8” x 1 ½” bolts should be used in all of the inner 
clamp flange holes. Tighten all bolts. 

4.

 

Install the special outer half bands provided. 

5.

 

For outdoor installation use silicone sealant 
instructions shown in figure 26. 

 
 
 
 
 
 
 
 
 
 
 
 

 
 
 

Figure 27 – Support Plate Assembly 

 
 

 
 

 

 

 

 

Summary of Contents for eVent

Page 1: ...sing Boiler Systems A MAJOR CAUSE OF VENT RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES AIR SPACES TO COMBUSTIBLE MATERIALS IT IS OF UTMOST IMPORTANCE THAT THIS VENT BE INSTALLED ONLY IN AC...

Page 2: ...ion GS 12 Operating Precautions 13 Maintenance 13 GENERAL These instructions cover installation requirements for the Schebler listed single and double wall special stainless steel venting systems eVen...

Page 3: ...pliance It is recommended that venting systems be enclosed below the roof line to limit condensation and protect against mechanical damage Methods of providing additional insulation may be specified I...

Page 4: ...being vented TERMINATION HEIGHT REQUIREMENTS Vents are to terminate a minimum of 3 ft 0 92 m above the highest point of the roof penetration and 2 ft 0 61m minimum above any portion of a building wit...

Page 5: ...ent eVentPLUS and eVentPLUS2 INDIVIDUAL PART INSTALLATION This section identifies Models eVentSW eVent eVentPLUS and eVentPLUS2 by name and part number or part code See the section titled Part Identif...

Page 6: ...allations install the weld seam along the top of the duct See figure 8 below Step 4 Make a single true cut through both gasket layers Remove excess gasket material and position cut ends such that they...

Page 7: ...W eVent eVent Plus2 has a 1 drain pipe that must be connected to a suitable drain The Drain Tee Cap must be connected at all times to a suitable drain Upon entering the vent rain will wash down and re...

Page 8: ...er band end clips allowing the V to be clamped between the split plates and split clamp flanges Installation for the Wall Support is accomplished with the following procedure 1 Connect the joint to be...

Page 9: ...greatest strength for support of the eVent Series Venting System It will provide vertical support and will provide for joint alignment and support for horizontal applications Locate and secure the Sup...

Page 10: ...following procedure should be used 1 Install the Rain Cap on the inner flange and attach the V band using the inner joint instructions 2 Install the provided skirt section as shown below 3 Apply a sil...

Page 11: ...Section While 3 guys are usually sufficient it is recommended that 4 equally spaced wires at an angle of 45 from the vertical be utilized The cables and guys must be slightly loose to allow for the th...

Page 12: ...located at a joint connection The Guy Section is comprised of four 4 half flanges and is bolted together as shown in figure 39 below with the supplied hardware The outer shell is then sealed by using...

Page 13: ...ANCE Venting and Exhaust Systems 1 After the installation of the vent or exhaust system ensure that the required clearances are maintained and that the system continues to be supported properly 2 The...

Page 14: ...14 February 2019 5665 Fenno Rd Bettendorf IA 52722 www Scheblerchimney com Phone 563 359 0110 Fax 563 359 8430...

Reviews: