INSTALLATION INSTRUCTIONS 

OPERATION AND MAINTENANCE MANUAL 

Models eVent, eVent Plus, eVent Plus2 and eVent SW 

(Condensing Boiler Systems) 

A MAJOR CAUSE OF VENT RELATED FIRES IS FAILURE TO 

MAINTAIN REQUIRED CLEARANCES (AIR SPACES) TO 

COMBUSTIBLE MATERIALS. IT IS OF UTMOST IMPORTANCE 

THAT THIS VENT BE INSTALLED ONLY IN ACCORDANCE WITH 

THESE INSTRUCTIONS.

 

IMPORTANT: DO NOT INSTALL VENTING 

SYSTEM WITHOUT FIRST READING THESE 

INSTRUCTIONS. 

 

 

 

US

C

Summary of Contents for eVent

Page 1: ...sing Boiler Systems A MAJOR CAUSE OF VENT RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES AIR SPACES TO COMBUSTIBLE MATERIALS IT IS OF UTMOST IMPORTANCE THAT THIS VENT BE INSTALLED ONLY IN AC...

Page 2: ...ion GS 12 Operating Precautions 13 Maintenance 13 GENERAL These instructions cover installation requirements for the Schebler listed single and double wall special stainless steel venting systems eVen...

Page 3: ...pliance It is recommended that venting systems be enclosed below the roof line to limit condensation and protect against mechanical damage Methods of providing additional insulation may be specified I...

Page 4: ...being vented TERMINATION HEIGHT REQUIREMENTS Vents are to terminate a minimum of 3 ft 0 92 m above the highest point of the roof penetration and 2 ft 0 61m minimum above any portion of a building wit...

Page 5: ...ent eVentPLUS and eVentPLUS2 INDIVIDUAL PART INSTALLATION This section identifies Models eVentSW eVent eVentPLUS and eVentPLUS2 by name and part number or part code See the section titled Part Identif...

Page 6: ...allations install the weld seam along the top of the duct See figure 8 below Step 4 Make a single true cut through both gasket layers Remove excess gasket material and position cut ends such that they...

Page 7: ...W eVent eVent Plus2 has a 1 drain pipe that must be connected to a suitable drain The Drain Tee Cap must be connected at all times to a suitable drain Upon entering the vent rain will wash down and re...

Page 8: ...er band end clips allowing the V to be clamped between the split plates and split clamp flanges Installation for the Wall Support is accomplished with the following procedure 1 Connect the joint to be...

Page 9: ...greatest strength for support of the eVent Series Venting System It will provide vertical support and will provide for joint alignment and support for horizontal applications Locate and secure the Sup...

Page 10: ...following procedure should be used 1 Install the Rain Cap on the inner flange and attach the V band using the inner joint instructions 2 Install the provided skirt section as shown below 3 Apply a sil...

Page 11: ...Section While 3 guys are usually sufficient it is recommended that 4 equally spaced wires at an angle of 45 from the vertical be utilized The cables and guys must be slightly loose to allow for the th...

Page 12: ...located at a joint connection The Guy Section is comprised of four 4 half flanges and is bolted together as shown in figure 39 below with the supplied hardware The outer shell is then sealed by using...

Page 13: ...ANCE Venting and Exhaust Systems 1 After the installation of the vent or exhaust system ensure that the required clearances are maintained and that the system continues to be supported properly 2 The...

Page 14: ...14 February 2019 5665 Fenno Rd Bettendorf IA 52722 www Scheblerchimney com Phone 563 359 0110 Fax 563 359 8430...

Reviews: