4. Put the threaded rod through the hole and run the spring, washer, and nut onto the threaded rod as
shown below. Before tightening the nut, check again that the belt is centered on the belt wheel on both
ends. Tighten the nut until the spring is almost entirely compressed, as shown below. The boom rail
assembly is now complete.
Figure 5
Mounting the wall bracket and door bracket
Figure 6
Wall bracket -
Close the garage door and measure the
garage door width at the top and mark the center. Locate and
mount the wall bracket 2 cm - 15 cm above the door on the
inside wall. (Depending on the actual installation space).
Door bracket -
Attach the door bracket to a structural part
of the door as close to the top edge as possible.
*Mounting screws for door bracket are not included in the package.*
36
Summary of Contents for Move 1000
Page 1: ......
Page 2: ...2 ...
Page 3: ...3 24 ...
Page 4: ...4 ...
Page 5: ...5 ...
Page 6: ... 6 ...
Page 7: ...7 ...
Page 8: ...8 ...
Page 12: ...12 Bild 7 Bild 8 Bild 9 Bild 10 Installation der Antriebsschiene mit Antriebskopf ...
Page 13: ...13 Bild 13 Bild 11 Bild 12 13 ...
Page 14: ...14 ...
Page 15: ...15 ...
Page 16: ...16 Bild 15 ...
Page 20: ...20 ...
Page 21: ...21 ...
Page 25: ......
Page 26: ......
Page 27: ...27 Declaration of Incorporation 49 ...
Page 29: ...29 ...
Page 30: ...30 ...
Page 31: ... 31 ...
Page 32: ...32 ...
Page 33: ...33 ...
Page 38: ...38 Figure 11 Figure 12 Figure 13 38 ...
Page 39: ...39 ...
Page 40: ...40 ...
Page 45: ...45 ...
Page 46: ...46 ...