background image

4

Novenco

®

  jet fan types AUO/ARO - ARP/AUZ - AUT/ART - AZT

Electric connection

1.

Check if current legislation 
prescribes installation of f.x. an 
emergency stop and include this in 
the installation.

2. AUO/ARO:

 Remove the cover plate 

on the fan casing to access the 
connection panel.

1. Remove screw in handle
2. Remove handle
3. Unscrew screws in cover
4. Remove cover

The switch can be used as safety 
isolator.

ARP/AUZ-AUT/ART-AZT:

 Remove 

the lid on the external terminal box.

3.

Connect the motor through a thermal 
relay based on the motor nominal 
current. Refer to the following 
information.

Connection references

 

Motor name plate

Order specification

Appendix 

“C. Wiring – AUO/

ARO

 on page 10

Appendix 

“D. Wiring – ARP/

AUZ/AUT/ART/AZT

 on 

page 10

AUO/ARO:

 Make the connections 

directly in the built-in switch.

ARP/AUZ-AUT/ART-AZT:

 Make 

the connections directly in the 
external terminal box.

4. AUO/ARO:

 Remount the cover plate 

from step 2 on the fan casing.

ARP/AUZ-AUT/ART-AZT:

 

Remount the lid from step 2 on the 
terminal box.

4.4 Approval for operation

The installation must be approved with 
regard to operation and interaction. The 

person responsible for the operation of 
the system must initiate this approval 
test. The test must be confirmed.
The person responsible for the operation 
of the system must keep the approval 
test documents. For jet fans approved for 
smoke control, the documents must be 
presented upon request from the 
authorities.

5. Start of operation

Perform the below steps every time the 
fans have been stopped.

5.1 Before startup

Check the fans and installation location 
in accordance to the below checklist and 
correct and improve as necessary.

Checklist

• Safe operation

Make sure that any wire guards on 
the suction side as well as guide 
vanes on the pressure sides are 
correctly mounted.

• Clean fans

The fans must be clean and free 
from tools and objects that can 
affect the airflow.

• Electrical connections

The electrical connections must be 
correct and in accordance to the 
prescribed requirements. 
Switch the fan power briefly On, 
then Off, to check the rotational 
direction of the rotor. Refer to the 
arrow plates on the fan casings.

5.2 Startup procedure

Startup procedure

1.

Start the fan.

2.

Check that no abnormal noises are 
present.

3.

Check that the vibration levels are 
acceptable.

See section “6.3 Vibration levels”.

4.

Check that the fan operates normally 
after 30 minutes of operation.

In the very first 30 minutes of operation, 
the motors may use more power than 
stated on the motor plate. This is the 
running-in period. The amperage 
depends among other things on the 
temperature.

The fans are designed for 
continuous operation. The 
below kinds of operation may 

cause fatigue breaks in the rotors and 
endanger people.

Operation in stall area, i.e. with 
counter pressure that pulsates - 
called pump mode

Operation with uninterrupted 
and repeated starts and stops

Uneven flow velocity through 
the fans

Ask Novenco if in doubt.

6. Maintenance

Keep the fans in good and operational 
condition to ensure functionality, fan life 
and warranty.

6.1 Before maintenance

Disconnect the fans from the 
electrical system, before 
initiation of any kinds of service 

on the fans. Make sure the fans cannot 
start accidentally. Fans controlled by 
automation may start suddenly, unless 
they are disconnected.
Fan units with external safety switches 
must be disconnected at the switches 
and secured, e.g. with locks. This is 
done in the fuse box or other centrally 
placed switch.

AUO/ARO: Setup of lock switch on fan

1.

Turn off the fan.
Depending on the system layout, 
turn off the power centrally or with 
the handle on the fan casing.

2.

Remove the cover plate on the fan 
casing.

3.

Insert a padlock underneath the 
handle to prevent the handle from 
being turned.
A plastic stick may obstruct the 

insertion of the lock. Dismount the 
handle and cut the stick off with a 
cutter. Remount the handle.

Figure 7.

Removal of cover on AUO/ARO

1

2

3

4

Figure 8.

Switch locked in Off position

Summary of Contents for NOVENCO ARO

Page 1: ...Pure competence in air ENGLISH 919044 0 NOVENCO JET FAN TYPES AUO ARO ARP AUZ AUT ART AZT INSTALLATION AND MAINTENANCE...

Page 2: ...plates on the fan casings Fan nameplate information Manufacturer information Product type e g AUO 380 160 4 Serial no Fan speed Year of manufacture Weight CE marking For smoke fans also Air performanc...

Page 3: ...d the operational conditions and the natural frequency of the foundation and supports Follow the below guidelines to avoid resonance Soft suspension Fan is fixated through springs or dampers The natur...

Page 4: ...the underside of the fan casing Reinsert the screws from the brackets in the casing AZT Reinsert the screws from the transport brackets in the casing 4 3 Electric connection The installation and conn...

Page 5: ...airflow Electrical connections The electrical connections must be correct and in accordance to the prescribed requirements Switch the fan power briefly On then Off to check the rotational direction of...

Page 6: ...fasteners item 01 and take down the fan 3 AUO ARO Remove set screws item 02 and dismount silencers items 03 Mark the silencers with tape so they are not mixed up ARP AUZ Remove set screws item 02 and...

Page 7: ...mance Inlet or outlet blocked Auxiliary fans stopped Motor defective Motor disconnected Electric connection defective Wrong direction of rotation Noise and vibrations Motor bearings defective Rotor in...

Page 8: ...to changes without furthernoticeduetocontinuousproduct development Copyright 1985 2020 Novenco Building Industry A S All rights are reserved 14 Quality management Novenco is ISO 9001 and 14001 certif...

Page 9: ...eclaration is valid provided that the installation and maintenance instructionsarefollowed Changestothe product without prior consultation with Novenco Building Industry A S invalidates the declaratio...

Page 10: ...r 10 Suspension brackets AZT Base plate 5 Motor suspension and guide vanes 11 Wire guard 6 Start stop switch or terminal box 12 Centre fairing Figure 11 Main components 10 07 03 01 04 11 09 05 06 10 0...

Page 11: ...s 12 Rivets 16 Stiffeners Figure 12 Main components Figure 13 Switch and connection diagram for AUO and ARO for both standard temperatures and 300 C optional Figure 14 External terminal box and connec...

Page 12: ...Pure competence in air ttt EKs E K h E KD...

Reviews: